Three-Phase Methodology Incorporating Scatter Search for Integrated Production, Inventory, and Distribution Routing Problem

المؤلفون المشاركون

Moin, Noor Hasnah
Yuliana, Titi

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-11، 11ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2015-07-06

دولة النشر

مصر

عدد الصفحات

11

التخصصات الرئيسية

هندسة مدنية

الملخص EN

This paper proposes the use of scatter search metaheuristic to solve an integrated production, inventory, and distribution routing problem.

The problem is based on a single production plant that produces a single product that is delivered to N geographically dispersed customers by a set of homogenous fleet of vehicles.

The objective is to construct a production plan and delivery schedule to minimize the total costs and ensuring each customer’s demand is met over the planning horizon.

We assumed that excess production can be stored at the plant or at customer’s sites within some limits, but stockouts due to backordering or backlogging are not allowed.

Further testing on a set of benchmark problems to assess the effectiveness of our method is also carried out.

We compare our results to the existing metaheuristic algorithms proposed in the literature.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Moin, Noor Hasnah& Yuliana, Titi. 2015. Three-Phase Methodology Incorporating Scatter Search for Integrated Production, Inventory, and Distribution Routing Problem. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-11.
https://search.emarefa.net/detail/BIM-1073471

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Moin, Noor Hasnah& Yuliana, Titi. Three-Phase Methodology Incorporating Scatter Search for Integrated Production, Inventory, and Distribution Routing Problem. Mathematical Problems in Engineering No. 2015 (2015), pp.1-11.
https://search.emarefa.net/detail/BIM-1073471

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Moin, Noor Hasnah& Yuliana, Titi. Three-Phase Methodology Incorporating Scatter Search for Integrated Production, Inventory, and Distribution Routing Problem. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-11.
https://search.emarefa.net/detail/BIM-1073471

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1073471