H∞ Guaranteed Cost Control for Networked Control Systems under Scheduling Policy Based on Predicted Error

المؤلفون المشاركون

Zhu, Yonghong
Zhu, Qixin
Lu, Kaihong

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-12، 12ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-03-20

دولة النشر

مصر

عدد الصفحات

12

التخصصات الرئيسية

هندسة مدنية

الملخص EN

Scheduling policy based on model prediction error is presented to reduce energy consumption and network conflicts at the actuator node, where the characters of networked control systems are considered, such as limited network bandwidth, limited node energy, and high collision probability.

The object model is introduced to predict the state of system at the sensor node.

And scheduling threshold is set at the controller node.

Control signal is transmitted only if the absolute value of prediction error is larger than the threshold value.

Furthermore, the model of networked control systems under scheduling policy based on predicted error is established by taking uncertain parameters and long time delay into consideration.

The design method of H∞ guaranteed cost controller is presented by using the theory of Lyapunov and linear matrix inequality (LMI).

Finally, simulations are included to demonstrate the theoretical results.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Zhu, Qixin& Lu, Kaihong& Zhu, Yonghong. 2014. H∞ Guaranteed Cost Control for Networked Control Systems under Scheduling Policy Based on Predicted Error. Mathematical Problems in Engineering،Vol. 2014, no. 2014, pp.1-12.
https://search.emarefa.net/detail/BIM-482896

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Zhu, Qixin…[et al.]. H∞ Guaranteed Cost Control for Networked Control Systems under Scheduling Policy Based on Predicted Error. Mathematical Problems in Engineering No. 2014 (2014), pp.1-12.
https://search.emarefa.net/detail/BIM-482896

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Zhu, Qixin& Lu, Kaihong& Zhu, Yonghong. H∞ Guaranteed Cost Control for Networked Control Systems under Scheduling Policy Based on Predicted Error. Mathematical Problems in Engineering. 2014. Vol. 2014, no. 2014, pp.1-12.
https://search.emarefa.net/detail/BIM-482896

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-482896