Nuclear power plant preventive maintenance scheduling problem with fuzziness
المؤلفون المشاركون
Abbas, Samir A.
Abd Allah, Asma S.
المصدر
Arab Journal of Nuclear Sciences and Applications
العدد
المجلد 46، العدد 1 (31 يناير/كانون الثاني 2013)، ص ص. 172-178، 7ص.
الناشر
الجمعية المصرية للعلوم النووية و تطبيقاتها
تاريخ النشر
2013-01-31
دولة النشر
مصر
عدد الصفحات
7
التخصصات الرئيسية
الملخص EN
Maintenance activity is regarded as the most important key factor for the safety, reliability and economy of a nuclear power plant.
Preventive maintenance refers to set of planned activities which include nondestructive testing and periodic inspection as well as maintenance.
In this paper, we address the problem of nuclear power plant preventive maintenance scheduling with uncertainty.
The uncertainty will be represente d by fuzzy parameters.
The problem is how to determine the period for which generating units of an electric system should be taken off line for planned preventive maintenance over specific time horizon.
Preventive maintenance activity of a nuclear power plant is an important issue as it designed to extend the plant life .
It is more required to review the maintenance not only from the view point of safety and reliability but also economy.
Preventive maintenance program exists to ensure that nuclear safety significant equipment will function when it is supposed to.
Also this problem is extremely important because a failure in a power plant may cause a general breakdown in an electric network.
In this paper a mixed integer programming model is used to express this problem.
In proposed model power demand is taken as fuzzy parameters.
A case study is provided to demonstrate the efficiency of the proposed model.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Abbas, Samir A.& Abd Allah, Asma S.. 2013. Nuclear power plant preventive maintenance scheduling problem with fuzziness. Arab Journal of Nuclear Sciences and Applications،Vol. 46, no. 1, pp.172-178.
https://search.emarefa.net/detail/BIM-724069
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Abbas, Samir A.& Abd Allah, Asma S.. Nuclear power plant preventive maintenance scheduling problem with fuzziness. Arab Journal of Nuclear Sciences and Applications Vol. 46, no. 1 (Jan. 2013), pp.172-178.
https://search.emarefa.net/detail/BIM-724069
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Abbas, Samir A.& Abd Allah, Asma S.. Nuclear power plant preventive maintenance scheduling problem with fuzziness. Arab Journal of Nuclear Sciences and Applications. 2013. Vol. 46, no. 1, pp.172-178.
https://search.emarefa.net/detail/BIM-724069
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references : p. 177-178
رقم السجل
BIM-724069
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر