Assessment of pain and bleeding in the first postoperative day following coblation tonsillectomy

المصدر

Basrah Journal of Surgery

العدد

المجلد 26، العدد 1 (30 يونيو/حزيران 2020)، ص ص. 65-68، 4ص.

الناشر

جامعة البصرة كلية الطب

تاريخ النشر

2020-06-30

دولة النشر

العراق

عدد الصفحات

4

التخصصات الرئيسية

الطب البشري

الموضوعات

الملخص EN

There are different techniques for tonsillectomy other than traditional such as; cold steel technique, bipolar diathermy, and nowadays the new plasma technology which is known as coblation (controlled ablation) tonsillectomy.

This study aimed to assess the first 24 hours postoperative pain and bleeding after coblation tonsillectomy.

Fifty patients aged between 4-10 years who underwent coblation tonsillectomy were included in this prospective descriptive study, the main indications for tonsillectomy were; recurrent tonsillitis and obstructive sleep apnoea.

The results showed that no bleeding at all within the first 24 hours with significant reduction in feeling of pain after.

In conclusion, coblation tonsillectomy is a promising technique to perform tonsillectomy

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

al-Maidi, Rafid Yasin Jabbar. 2020. Assessment of pain and bleeding in the first postoperative day following coblation tonsillectomy. Basrah Journal of Surgery،Vol. 26, no. 1, pp.65-68.
https://search.emarefa.net/detail/BIM-972488

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

al-Maidi, Rafid Yasin Jabbar. Assessment of pain and bleeding in the first postoperative day following coblation tonsillectomy. Basrah Journal of Surgery Vol. 26, no. 1 (Jun. 2020), pp.65-68.
https://search.emarefa.net/detail/BIM-972488

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

al-Maidi, Rafid Yasin Jabbar. Assessment of pain and bleeding in the first postoperative day following coblation tonsillectomy. Basrah Journal of Surgery. 2020. Vol. 26, no. 1, pp.65-68.
https://search.emarefa.net/detail/BIM-972488

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references : p. 68

رقم السجل

BIM-972488