Calculating production rate of each branch of a multilateral well using multi-segment well model : field example

Other Title(s)

حساب معدل إنتاج كل ذراع في بئر متعدد الأذرع باستخدام موديل بئر متعدد الأجزاء : مثال حقلي

Joint Authors

al-Jawad, Muhammad Salih
Abd al-Razzaq, Muhal Abd al-Wahhab

Source

Journal of Engineering

Issue

Vol. 23, Issue 11 (30 Nov. 2017), pp.78-88, 11 p.

Publisher

University of Baghdad College of Engineering

Publication Date

2017-11-30

Country of Publication

Iraq

No. of Pages

11

Main Subjects

Engineering & Technology Sciences (Multidisciplinary)

Abstract EN

Multilateral wells require a sophisticated type of well model to be applied in reservoir simulators to represent them.

The model must be able to determine the flow rate of each fluid and the pressure throughout the well.

The production rate calculations are very important because they give an indication about some main issues associated with multi-lateral wells such as one branch may produce water or gas before others, no production rate from one branch, and selecting the best location of a new branch for development process easily.

This paper states the way to calculate production rate of each branch of a multilateral well-using multi-segment well model.

The pressure behaviour of each branch is simulated dependent on knowing its production rate.

This model has divided a multi-lateral well into an arbitrary number of segments depending on the required degree of accuracy and run time of the simulator.

The model implemented on a field example (multi-lateral well HF-65ML) in Halfaya Oil Field/Mishrif formation.

The production rate and pressure behaviour of each branch are simulated during the producing interval of the multilateral well.

The conclusion is that production rate of the main branch is slightly larger than a lateral branch.

American Psychological Association (APA)

al-Jawad, Muhammad Salih& Abd al-Razzaq, Muhal Abd al-Wahhab. 2017. Calculating production rate of each branch of a multilateral well using multi-segment well model : field example. Journal of Engineering،Vol. 23, no. 11, pp.78-88.
https://search.emarefa.net/detail/BIM-793781

Modern Language Association (MLA)

al-Jawad, Muhammad Salih& Abd al-Razzaq, Muhal Abd al-Wahhab. Calculating production rate of each branch of a multilateral well using multi-segment well model : field example. Journal of Engineering Vol. 23, no. 11 (Nov. 2017), pp.78-88.
https://search.emarefa.net/detail/BIM-793781

American Medical Association (AMA)

al-Jawad, Muhammad Salih& Abd al-Razzaq, Muhal Abd al-Wahhab. Calculating production rate of each branch of a multilateral well using multi-segment well model : field example. Journal of Engineering. 2017. Vol. 23, no. 11, pp.78-88.
https://search.emarefa.net/detail/BIM-793781

Data Type

Journal Articles

Language

English

Notes

Includes appendices : p. 82-88

Record ID

BIM-793781