أسباب تأخير المشاريع العمومية الإنشائية : دراسة ميدانية لمشاريع السكن و التجهيزات العمومية
Other Title(s)
Delays in public projects : the case of construction projects and public Equipments
Author
Source
Issue
Vol. 10, Issue 3 (30 Sep. 2018), pp.544-564, 21 p.
Publisher
Ziane Achour University of Djelfa
Publication Date
2018-09-30
Country of Publication
Algeria
No. of Pages
21
Main Subjects
Topics
Abstract EN
This study is concerned with an empirical investigation that explores the reasons that have caused the delay in public construction projects in Souk-Ahras.
The data was gathered from a survey of 28 construction firms .
The results of the survey have identified three types of delays: delays caused by bureaucracy of public management, the delays caused by the entrepreneur, and delays caused by external factors.
The results also showed a significant relationship between the three types of delays and experience of the entrepreneur, on the one hand, and between the three types of delays and the project size, on the other
American Psychological Association (APA)
ملايكية، عامر. 2018. أسباب تأخير المشاريع العمومية الإنشائية : دراسة ميدانية لمشاريع السكن و التجهيزات العمومية. دراسات و أبحاث،مج. 10، ع. 3، ص ص. 544-564.
https://search.emarefa.net/detail/BIM-852438
Modern Language Association (MLA)
ملايكية، عامر. أسباب تأخير المشاريع العمومية الإنشائية : دراسة ميدانية لمشاريع السكن و التجهيزات العمومية. دراسات و أبحاث مج. 10، ع. 3 (أيلول 2018)، ص ص. 544-564.
https://search.emarefa.net/detail/BIM-852438
American Medical Association (AMA)
ملايكية، عامر. أسباب تأخير المشاريع العمومية الإنشائية : دراسة ميدانية لمشاريع السكن و التجهيزات العمومية. دراسات و أبحاث. 2018. مج. 10، ع. 3، ص ص. 544-564.
https://search.emarefa.net/detail/BIM-852438
Data Type
Journal Articles
Language
Arabic
Notes
يتضمن مراجع ببليوجرافية.
Record ID
BIM-852438