دور مكونات التخطيط الاستراتيجي في أداء المشروعات الإنشائية على وفق مؤشرات (KPI)‎ : بحث ميداني في الشركة العامة لتنفيذ مشاريع النقل-أحد تشكيلات وزارة النقل في العراق

Other Title(s)

The role of strategic planning components in the performance of construction projects according to KPI indicators :

Joint Authors

رقية عبد الرحيم كريم
العبادي، سناء عبد الرحيم سعيد

Source

مجلة تكريت للعلوم الإدارية و الاقتصادية

Issue

Vol. 16, Issue 52، ج. 2 (31 Dec. 2020), pp.293-311, 19 p.

Publisher

Tikrit University College of Administration and Economic

Publication Date

2020-12-31

Country of Publication

Iraq

No. of Pages

19

Main Subjects

Business Administration
Economy and Commerce

Topics

Abstract EN

The rapid growth and development in various economic, industrial and highly competitive fields in the business sectors, especially the sector of public contracting companies and construction projects, has generated great pressure on these companies to improve the performance of their construction projects and adopt contemporary methods in generating plans and strategies to control the future and ensure their good position in the long term.

the long, Out of This Problem, The problem of the current research is based on defining the role of applying public sector companies specialized in the field of construction projects and engineering works to the strategic planning process represented by (vision, mission, goals, environmental analysis, strategic choice) in the performance of their construction projects according to the main performance indicators KPI, Consequently, the research aimed to prove the correlation and impact relationship between the two variables of the research, namely strategic planning and construction project performance according to the main performance indicators KPI, and to achieve this goal a main questionnaire was developed that was distributed to a sample of 50 individuals representing the higher departments of the General Director and his assistants, department directors and officials, in order to prove the hypotheses of the research and ensure the existence of correlations and impact between the two variables of the research and after the data were collected and analyzed by the statistical program SPSS, As a set of results were reached, the most prominent of which was the existence of a correlation and impact relationship between the two main research variables, namely strategic planning and construction project performance according to the KPI.

Five key performance indicators were also reached, which are cost Indicator, time Indicator, quality Indicator, General satisfaction Indicator, and environmental safety and security Indicator.

American Psychological Association (APA)

العبادي، سناء عبد الرحيم سعيد ورقية عبد الرحيم كريم. 2020. دور مكونات التخطيط الاستراتيجي في أداء المشروعات الإنشائية على وفق مؤشرات (KPI) : بحث ميداني في الشركة العامة لتنفيذ مشاريع النقل-أحد تشكيلات وزارة النقل في العراق. مجلة تكريت للعلوم الإدارية و الاقتصادية،مج. 16، ع. 52، ج. 2، ص ص. 293-311.
https://search.emarefa.net/detail/BIM-1024796

Modern Language Association (MLA)

العبادي، سناء عبد الرحيم سعيد ورقية عبد الرحيم كريم. دور مكونات التخطيط الاستراتيجي في أداء المشروعات الإنشائية على وفق مؤشرات (KPI) : بحث ميداني في الشركة العامة لتنفيذ مشاريع النقل-أحد تشكيلات وزارة النقل في العراق. مجلة تكريت للعلوم الإدارية و الاقتصادية مج. 16، ع. 52، ج. 2 (2020)، ص ص. 293-311.
https://search.emarefa.net/detail/BIM-1024796

American Medical Association (AMA)

العبادي، سناء عبد الرحيم سعيد ورقية عبد الرحيم كريم. دور مكونات التخطيط الاستراتيجي في أداء المشروعات الإنشائية على وفق مؤشرات (KPI) : بحث ميداني في الشركة العامة لتنفيذ مشاريع النقل-أحد تشكيلات وزارة النقل في العراق. مجلة تكريت للعلوم الإدارية و الاقتصادية. 2020. مج. 16، ع. 52، ج. 2، ص ص. 293-311.
https://search.emarefa.net/detail/BIM-1024796

Data Type

Journal Articles

Language

Arabic

Notes

-

Record ID

BIM-1024796