أثر الخيارات و الظروف الطارئة في عقد استصناع الأبنية : دراسة فقهية تحليلية

Other Title(s)

The effect of options and emergency circumstances on buildings manufacturing contract : an analytical jurisprudence study

Joint Authors

المرزوقي، عامر عبد الرحيم
الرفاعي، حسن محمد

Source

مجلة البحوث العلمية والدراسات الإسلامية

Issue

Vol. 13, Issue 4 (31 Dec. 2021), pp.313-348, 36 p.

Publisher

Algiers University 1 Benyoucef Benkhedda Faculty of Islamic Sciences-Karoubier Laboratory of Islamic Law (Shari'a)

Publication Date

2021-12-31

Country of Publication

Algeria

No. of Pages

36

Main Subjects

Islamic Studies

Topics

Abstract AR

تضمن هذا البحث بيان مفهوم عقد استصناع الأبنية، بالإضافة إلى بيان مفهوم و مشروعية كل من خيار الرؤية و العيب و الشرط و الظروف الطارئة من الناحية الفقهية، و أثر هذه الخيارات و الظروف في عقد استصناع الأبنية، من ناحية لزوم العقد من عدمه، و من ناحية إمكان فسخ العقد من عدمه، أو إمكان تعديل فقراته، و النظر إلى مدى ملاءمة هذه الخيارات و الظروف الطارئة في حفظ حق طرفي العقد.

وقد استخدم الباحث فيه مناهج الاستقراء و التحليل و الاستنباط.

وتوصل الباحث إلى عدد من النتائج من أهمها: أن عقد استصناع الأبنية عند إنهاء تصنيع البناء في حق المستصنع غير لازم إلا بعد الرؤية و الرضا بما صنعه الصانع، وأنه يكون لازما للطرفين إن جاء متوافقا مع الشروط و المواصفات.

وأن مفهوم العيب في عقد استصناع الأبنية لا ينحصر في كل ما أنقص القيمة و الثمن، بل يتعداه إلى مخالفة الصانع للمواصفات التي وضعها المستصنع، وأنه في حال وجود العيب في محل العقد فيكون للمستصنع الحق بإنقاص الثمن أو الحق برد عمل الصانع و المطالبة بإعادة البناء أو إعادة بناء الجزء الذي دخله العيب.

وأن للمستصنع اشتراط المدة التي تتناسب مع طبيعة البناء من عمارة و نحوها باستعماله خيار الشرط، و لا يقتصر في ذلك على ثلاثة أيام.

وأن من حق طرفي العقد المطالبة بتعديل فقرات العقد أو الفسخ في حال وجود ما يدرج تحت الظروف الطارئة.

وحوى البحث توصية واحدة تمثلت بحث الجهات المختصة على إدراج تلك الخيارات مع آثارها في بنود عقود استصناع الأبنية، بالإضافة إلى ما له صله بالظروف الطارئة في هذا المجال؛ لما لها من دور من التخفيف من آثار النزاعات في حال وقوعها بين طرفي العقد.

Abstract EN

The current study included revelation of the concept of buildings manufacturing, in addition to the concept and legitimacy of each option of seeing, defect, condition and emergency circumstances from the jurisprudence point of view, and the effect of these options and circumstances on the building manufacturing contract in terms of whether the contract is binding or not, it can be terminated or not, the possibility of amending its items and considering the extent of fittings of these options and emergency circumstances in preserving the right of both parties of the contract.

The researcher adopted the deductive, analytical, and inductive methods in this study.

He found many results, the most prominent ones were the buildings manufacturing contract at the completion of building making in the right of the maker isn’t binding until after seeing and satisfaction with what the manufacturer has made.

The contract must be binding on both parties if it was compatible with the conditions and specifications.

The concept of defect in the buildings manufacturing contract isn’t restricted to everything reduced value and price, but it exceeded to manufacturer’s violence to specifications have been set by the one who asked for the manufacturing, and in terms there was a defect in the contract, he has the right to reduce price or return the manufacture’s work and demand the rebuilding or rebuilding the defecting part and requirement of the appropriate period with the nature of building such as constructing and others by using the option of the condition and it isn’t restricted to three days.

The two parties of the contract have the right to demand the amendment of the items of the contract or terminate it in the case of what is included under emergency circumstances The study made one recommendation represented in urging the relevant authorities to include these options with their effects in the items of building manufacturing contracts, in addition to everything that has relation with emergency circumstances in this field since they have a role in reduction the effects of conflicts in case they occur between the two parties of the contract.

American Psychological Association (APA)

المرزوقي، عامر عبد الرحيم والرفاعي، حسن محمد. 2021. أثر الخيارات و الظروف الطارئة في عقد استصناع الأبنية : دراسة فقهية تحليلية. مجلة البحوث العلمية والدراسات الإسلامية،مج. 13، ع. 4، ص ص. 313-348.
https://search.emarefa.net/detail/BIM-1297721

Modern Language Association (MLA)

المرزوقي، عامر عبد الرحيم والرفاعي، حسن محمد. أثر الخيارات و الظروف الطارئة في عقد استصناع الأبنية : دراسة فقهية تحليلية. مجلة البحوث العلمية والدراسات الإسلامية مج. 13، ع. 4 (2021)، ص ص. 313-348.
https://search.emarefa.net/detail/BIM-1297721

American Medical Association (AMA)

المرزوقي، عامر عبد الرحيم والرفاعي، حسن محمد. أثر الخيارات و الظروف الطارئة في عقد استصناع الأبنية : دراسة فقهية تحليلية. مجلة البحوث العلمية والدراسات الإسلامية. 2021. مج. 13، ع. 4، ص ص. 313-348.
https://search.emarefa.net/detail/BIM-1297721

Data Type

Journal Articles

Language

Arabic

Notes

يتضمن هوامش.

Record ID

BIM-1297721