Planning the production of the electrical distribution converter (400kv 11)‎ using time series methods and goal programming in the fuzzy environment

Other Title(s)

تخطيط إنتاج محولة التوزيع الكهربائي (400Kv 11)‎ باستعمال اساليب السلاسل الزمنية و برمجة الأهداف في البيئة الضبابية

Joint Authors

Ayid, Safa Basim
Khalaf, Waqas Sad

Source

Journal of Economics and Administrative Science

Issue

Vol. 28, Issue 131 (31 Mar. 2022), pp.1-23, 23 p.

Publisher

University of Baghdad College of Administration and Economics

Publication Date

2022-02-28

Country of Publication

Iraq

No. of Pages

23

Main Subjects

Economy and Commerce

Topics

Abstract EN

This Paper aims to plan the production of the electrical distribution converter (400 KV/11) for one month at Diyala Public Company and with more than one goal for the decision maker in a fuzzy environment.

The fuzzy demand was forecasting using the fuzzy time series model.

The fuzzy lead time for raw materials involved in the production of the electrical distribution converter (400 KV/11) was addressed using the fuzzy inference matrix through the application of the matrix in Matlab, and since the decision-maker has more than one goal, so a mathematical model of goal programming was create, which aims to achieve two goals, the first is to reduce the total production costs of the electrical distribution converter (400 KV/11) and the second is to maximize the amount produced from them, where the fuzzy data of the mathematical model were processed using the ranking function.

Through the results obtained to solve the mathematical model using the lingo program, we find that the mathematical model has achieved both objectives, i.

e.

reduce the total production costs of the main product to less than (4464254500) Iraqi dinars and maximize the amount produced from the main product for more than (17000) parts per month

American Psychological Association (APA)

Ayid, Safa Basim& Khalaf, Waqas Sad. 2022. Planning the production of the electrical distribution converter (400kv 11) using time series methods and goal programming in the fuzzy environment. Journal of Economics and Administrative Science،Vol. 28, no. 131, pp.1-23.
https://search.emarefa.net/detail/BIM-1339963

Modern Language Association (MLA)

Ayid, Safa Basim& Khalaf, Waqas Sad. Planning the production of the electrical distribution converter (400kv 11) using time series methods and goal programming in the fuzzy environment. Journal of Economics and Administrative Science Vol. 28, no. 131 (Mar. 2022), pp.1-23.
https://search.emarefa.net/detail/BIM-1339963

American Medical Association (AMA)

Ayid, Safa Basim& Khalaf, Waqas Sad. Planning the production of the electrical distribution converter (400kv 11) using time series methods and goal programming in the fuzzy environment. Journal of Economics and Administrative Science. 2022. Vol. 28, no. 131, pp.1-23.
https://search.emarefa.net/detail/BIM-1339963

Data Type

Journal Articles

Language

English

Notes

Includes bibliographical references : p. 21-22

Record ID

BIM-1339963