استخدام نموذج الشبكات العصبية الاصطناعية في تقدير تكاليف مشاريع الطرق في محافظة الانبار غرب العراق

Other Title(s)

The use of artificial neural network model to estimate the costs of road projects in Anbar province-west Iraq

Author

شيحان، شهاب حمد

Source

مجلة البحوث و الدراسات الاقتصادية

Issue

Vol. 26, Issue 10 (31 Dec. 2022), pp.87-123, 37 p.

Publisher

Higher Institute for Science and Technology-Derna (Previously) / Libyan Academy for Postgraduate Studies-Derna (Currently)

Publication Date

2022-12-31

Country of Publication

Libya

No. of Pages

37

Main Subjects

Information Technology and Computer Science

Abstract AR

ان تقدير التكاليف في مشاريع الطرق في محافظة الانبار وبدقة عالية وفي مراحل التطوير والتنمية يكون مهما وحاسما في التخطيط لا عداد دراسات الجدوى الفنية والاقتصادية, وتحسين مستوى الخدمات البلدية, وعلى اية حال تظهر صعوبات عديدة عندما يتم تقدير او حساب تكاليف انشاء الطرق اثناء مرحلة الاعداد والتخطيط لتلك المشاريع, حيث تواجه دوائر التخطيط والادارة مشاكل رئيسية في قلة المعلومات التمهيدية وقلة قاعدة البيانات وتحديد الكلف والبيانات غير الدقيقة، بالاضافة الى قلة الطرق العلمية في تقدير التكاليف، وبالتالي فان طريقة الشبكات العصيبة الصناعية المستخدمة في هذه الدراسة تقلل من مشاكل تنبؤ التكاليف، وتستخدم بشكل واسع لمعالجة تلك المشاكل.

وتعد هذه الطريقة منهجية جديدة في بناء النماذج والتحليل وتقييم البيانات والتنبؤ والسيطرة.

في هذه الدراسة، جرى استخدام الشبكات العصبية الصناعية لايجاد نموذج لحساب تكاليف انشاء الطرق في محافظة الانبار.

لقد تم استخدام قاعدة بيانات تم الحصول عليها من مديرية طرق الانبار، وقد شملت ما مجموعه (152) طريق رئيسي وثانوي.

ان مدخلات النموذج كانت كلاتي: اطوال الطرق (كيلومتر), حجم الاعمال الترابية (الف متر مكعب) ومدة التنفيذ (يوم) اما مخرجات النموذج فكان تكاليف انشاء الطرق (مليون دينار عراقي).

كما تم استخدام الشبكات المتعددة الطبقات بتقنية الانتشار الرجعي لخط نمذجة تكاليف الانشاء.

وتم دراسة العديد من الحالات التي لها علاقة ببناء الشبكات العصبية الصناعية منها معمارية الشبكة والعوامل الداخلية لها ومدى تاثيرهاعلى اداء نماذج الشبكات العصبية الصناعية, ومن معلومات الشبكات تم استنباط معلومات حول الاهمية النسبية للعوامل المؤثرة على حساب التكاليف ووضعت معادلة حسابية لحساب تلك التكاليف.

لقد وجد بان الشبكات العصبية الصناعية لها القابلية على تنبؤ تكاليف انشاء الطرق بدرجة جيدة من الدقة كما ان النماذج التي تم بناءها لدراسة تاثير العوامل الداخلية للشبكات على اداءها اظهرت ان اداء الشبكات حساس لعدد العقد في الطبقة المخفية, معدل التعلم, معادلات النقل ومتغير الزخم.

لقد اظهر تحليل الحساسية لنموذج التكاليف بان حجم الاعمال الترابية واطوال الطرق لها الدور الاكبر في تحديد التكاليف يتبعه في الاهمية مدة التنفيذ وبأهمية نسبية (0.98, 0.98 , 0.77) على التوالي.

ان معادلة نموذج الشبكة العصبية الصناعية التي وجدت في هذه الدراسة لحساب التكاليف كانت معقدة بالحسابات لذلك تمت كتابتها وبرمجتها لتسهيل وتسريع الحسابات.

Abstract EN

The cost estimate in road projects in Anbar province and with high accuracy and in the stages of development and development is an important and crucial role in planning in the preparation of feasibility studies, technical, economic , and improve the level of municipal services , and in any case show many difficulties when estimating or calculate the costs of road construction during the preparation phase and planning for those projects, where facing departments planning and management are major problems in the lack of preliminary information and the lack of database and determine the costs and data inaccurate in addition to the lack of scientific methods to estimate the costs and therefore the way networks troubled industrial used in this study reduces the problems predict costs and is widely used to address those the problems this way a new methodology in building models , analysis and evaluation of data , forecasting and control.

In this study, has been using artificial neural networks to create a model to calculate the cost of road construction in Anbar province.

I have been using a database obtained from the Directorate of ways Anbar have included a total of (152) by major and minor .

The model inputs was Klaty : lengths of roads (km) , dirt business volume (thousand cubic meters) and the implementation period (days) The output of the model was the cost of road construction (million Iraqi dinars).

In this study, the use of multi-layered networks retrograde spread of technology Khtalnmzjh construction costs .

Has been studying many of the cases related to the construction of Artificial Neural Networks , including network architecture and internal factors have and how Taterhaaly performance models Artificial Neural Networks, and information networks have been developed information about the relative importance of the factors affecting the calculation of costs and put the equation calculation to calculate those costs.

I've found that the Artificial Neural Networks have the ability to predict the cost of road construction degree good accuracy as the models that have been built to study the effect of the internal factors of the networks on their performance showed that the performance of the network is sensitive to the number of nodes in the layer hidden, learning rate , equations of transport and variable momentum.

Has shown a sensitivity analysis to model the costs that the business volume and lengths of dirt roads have a bigger role in determining the costs followed in importance for implementation and the relative importance of (0.98 , 0.98 , 0.77), respectively.

The equation of industrial neural network model which is found in this study to calculate the costs were complicated calculations that were written and programmed to facilitate and speed up the calculations

American Psychological Association (APA)

شيحان، شهاب حمد. 2022. استخدام نموذج الشبكات العصبية الاصطناعية في تقدير تكاليف مشاريع الطرق في محافظة الانبار غرب العراق. مجلة البحوث و الدراسات الاقتصادية،مج. 26، ع. 10، ص ص. 87-123.
https://search.emarefa.net/detail/BIM-1510360

Modern Language Association (MLA)

شيحان، شهاب حمد. استخدام نموذج الشبكات العصبية الاصطناعية في تقدير تكاليف مشاريع الطرق في محافظة الانبار غرب العراق. مجلة البحوث و الدراسات الاقتصادية مج. 26، ع. 10 (كانون الأول 2022)، ص ص. 87-123.
https://search.emarefa.net/detail/BIM-1510360

American Medical Association (AMA)

شيحان، شهاب حمد. استخدام نموذج الشبكات العصبية الاصطناعية في تقدير تكاليف مشاريع الطرق في محافظة الانبار غرب العراق. مجلة البحوث و الدراسات الاقتصادية. 2022. مج. 26، ع. 10، ص ص. 87-123.
https://search.emarefa.net/detail/BIM-1510360

Data Type

Journal Articles

Language

Arabic

Notes

يتضمن مراجع ببليوجرافية : ص. 123

Record ID

BIM-1510360