![](/images/graphics-bg.png)
قياس الكفاءة الانتاجية لعنصر العمل للشركة العامة للاسلاك و المنتجات الكهربائية خلال الفترة من : 1985-1991 م
Other Title(s)
Labor productivity estimation in the general company of wires and electric products
Author
Source
Issue
Vol. 4, Issue 1 (31 Mar. 1992), pp.109-123, 15 p.
Publisher
Publication Date
1992-03-31
Country of Publication
Libya
No. of Pages
15
Main Subjects
Economics & Business Administration
Abstract EN
The main objective of this paper is to estimate the labour productivity in the (General Wires & Electrical ?roducts Co.)G.W.E.?.
Annual date for the period 1985-1991 is used, ?hysical method is adapted to measure the production and labour in this study.
This paper is divided into in-troduction in part (1).
The meaning of productivity in part (2) part (3) discusses the measurement methods of pro-duction & labour, and measurement problems for each one.
In part (4) & (5) estimated the production and labour for «G.W.P» respec-tively.
Measurement of labour productivity in «G.W.E.?» is provided in part (6).
The con-
American Psychological Association (APA)
فياض، محمد خليل. 1992. قياس الكفاءة الانتاجية لعنصر العمل للشركة العامة للاسلاك و المنتجات الكهربائية خلال الفترة من : 1985-1991 م. مجلة البحوث الاقتصادية،مج. 4، ع. 1، ص ص. 109-123.
https://search.emarefa.net/detail/BIM-618409
Modern Language Association (MLA)
فياض، محمد خليل. قياس الكفاءة الانتاجية لعنصر العمل للشركة العامة للاسلاك و المنتجات الكهربائية خلال الفترة من : 1985-1991 م. مجلة البحوث الاقتصادية مج. 4، ع. 1 (آذار 1992)، ص ص. 109-123.
https://search.emarefa.net/detail/BIM-618409
American Medical Association (AMA)
فياض، محمد خليل. قياس الكفاءة الانتاجية لعنصر العمل للشركة العامة للاسلاك و المنتجات الكهربائية خلال الفترة من : 1985-1991 م. مجلة البحوث الاقتصادية. 1992. مج. 4، ع. 1، ص ص. 109-123.
https://search.emarefa.net/detail/BIM-618409
Data Type
Journal Articles
Language
Arabic
Notes
يتضمن هوامش.
Record ID
BIM-618409