جدولة المشروع باستعمال أسلوب برمجة الأهداف : بحث تطبيقي في مشروع القرية العصرية (محور الأبنية السكنية)‎ في محافظة واسط

Other Title(s)

Project scheduling by using goals programming : an applied research in modern village project (residential building aspectin in Wasit Governorate)‎

Joint Authors

وقاص سعد خلف
تمام سلمان خضر

Source

مجلة العلوم الاقتصادية و الإدارية

Issue

Vol. 21, Issue 85 (31 Oct. 2015), pp.169-201, 33 p.

Publisher

University of Baghdad College of Administration and Economics

Publication Date

2015-10-31

Country of Publication

Iraq

No. of Pages

33

Main Subjects

Business Administration

Topics

Abstract AR

إن من أهم التحديات التي تواجه إدارة المشروع في الوقت الحاضر هو ضمان إنجاز المشروع على الرغم من خضوعه لقيود محددة منها قيود تتعلق بالوقت و أخرى تتعلق بالموارد المالية المخصصة للمشروع لذا فإن هذا الأمر يتطلب حساب دقيق للوقت و الكلفة، فمشروع القرية العصرية (محور الأبنية السكنية) هو أحد المشاريع الضخمة و التي تسعى وزارة الزراعة إلى إنجازها في محافظة واسط حيث تم اختيار هذا المشروع بوصفه من المشاريع التي فيها العمل متلكأ و على هذا الأساس تمت دراسة المشروع من جديد وفق الأساليب العملية و الرياضية الحديثة حيث استعمل أحد أساليب جدولة و إدارة المشروع و هو أسلوب المسار الحرج (CPM) لإيجاد وقت إنجاز مشروع الأبنية السكنية علما أن الكثير.

من الأنشطة في شبكة المشروع لم تكن العلاقات بينها تقليدية (من نوع Finish to Start) كما تضمنت وجود فترات التقديم و التأخير (Lead and Lag) بينها و عليه تم استعمال أحد البرامج الرائدة في إدارة و جدولة المشروع و هو برنامج (PrimaveraV6) لإيجاد وقت و كلفة إنجاز المشروع في الظروف الطبيعية و التعجيلية، و بما أن لإدارة المشروع أهداف عديدة و منها متناقضة تسعى إلى تحقيقها في آن واحد الأمر الذي يتطلب الجهد الكبير و صعوبة الوصول إلى القرارات المناسبة و الدقيقة من قبل متخذ القرار فكان لابد من استعمال أسلوب رياضي كفوء و هو برمجة الأهداف (Goal Programming) لتحقيق هذه الأهداف حيث بينت النتائج المستحصلة من حل الأنموذج الرياضي باستعمال أحد البرامج الجاهزة (WinQ.S.B V2) إلى أهمية هذا الأسلوب و كفاءته في جدولة مشروع القرية العصرية (محور الأبنية السكنية) في ظل وجود أهداف عديدة و متناقضة لإدارة المشروع حددتها وفق أهميتها و تسعى إلى تحقيقها في آن واحد.

Abstract EN

One of the most important challenges facing project management at present time is to ensure project accomplishment in spite of the specific restrictions like the specific time the financial resources specialized to do the project ; which require an accurate consideration for time and cost .

the modern village project (residential building aspect) is one of the great project that ministry of agriculture is trying to do Wasit governorate it is chosen as the work in this project is dilatory for that is being studied in term of some modern mathematical and scientific methods like critical path method (CPM)which is one of the project management and scheduling methods to know the time needed to accomplish residential building project , with acknowledgement that many activities of project net are of unconventional relations among each others (of type finish to start) ; and there are periods of (lead and lag) among each other for that reason , (primavera V6) program is used in project scheduling and management which is one of prime programs to find the time and cost of project accomplishment at normal and crash states ; and as project management has numerous goals , same of them are contradictory which are trying to do in one time and that require great working and decision-makers face difficulty to reach into accurate and suitable decisions (goal programming) method is used which is one of efficient and mathematical method to achieve the objectives the results obtained of the mathematical model solution with the use of (win Q.S.B V2) program show the importance and efficiency of this method in modern village project scheduling (residential building aspect) under numerous contrasted goal that project management determined according to their importance and to be achieved according to their importance and to be achieved in one time .

American Psychological Association (APA)

وقاص سعد خلف وتمام سلمان خضر. 2015. جدولة المشروع باستعمال أسلوب برمجة الأهداف : بحث تطبيقي في مشروع القرية العصرية (محور الأبنية السكنية) في محافظة واسط. مجلة العلوم الاقتصادية و الإدارية،مج. 21، ع. 85، ص ص. 169-201.
https://search.emarefa.net/detail/BIM-622383

Modern Language Association (MLA)

وقاص سعد خلف وتمام سلمان خضر. جدولة المشروع باستعمال أسلوب برمجة الأهداف : بحث تطبيقي في مشروع القرية العصرية (محور الأبنية السكنية) في محافظة واسط. مجلة العلوم الاقتصادية و الإدارية مج. 21، ع. 85 (2015)، ص ص. 169-201.
https://search.emarefa.net/detail/BIM-622383

American Medical Association (AMA)

وقاص سعد خلف وتمام سلمان خضر. جدولة المشروع باستعمال أسلوب برمجة الأهداف : بحث تطبيقي في مشروع القرية العصرية (محور الأبنية السكنية) في محافظة واسط. مجلة العلوم الاقتصادية و الإدارية. 2015. مج. 21، ع. 85، ص ص. 169-201.
https://search.emarefa.net/detail/BIM-622383

Data Type

Journal Articles

Language

Arabic

Notes

يتضمن مراجع ببليوجرافية : ص. 200

Record ID

BIM-622383