استخدام أسلوب المسار الحرج (CPM)‎ في تخطيط و جدولة عمليات المشاريع الإنشائية : دراسة حالة تطبيقية

Other Title(s)

Using critical path method in planningand scheduling processes of constructive projects : an applied case study

Joint Authors

عمر، زينب عمر سالم
المحياوي، قاسم نايف علوان

Source

مجلة الإصلاحات الاقتصادية و الاندماج في الاقتصاد العالمي

Issue

Vol. 2007, Issue 2 (30 Jun. 2007), pp.113-134, 22 p.

Publisher

Ecole Supérieure de Commerce laboratoire des Reformes Economiques Développement et Stratégies D’intégration En Economie Mondiale

Publication Date

2007-06-30

Country of Publication

Algeria

No. of Pages

22

Main Subjects

Economy and Commerce

Abstract EN

The process of scheduling is largely privileged by mangers of constructive projects as an important tool for carrying out their project activities.

This process helps in stating an accurate time table for carrying out their activities in a proper time within the limits of available possibilities and resources.

Hence, the problem of this study is latent in the possibility of planning a model that may help managers in planning and scheduling for their projects activities.

So this study aims at set of objectives, the most important ones are: 1- Determination of the offered network to follow up the work of the project and understanding the possibility of finishing the work with the least cost in the shortest time2- Defining the effect of using critical path model(CPM) on the work achievement and hence on the cost of work.

To fulfill the objectives of the study and in response to the problem of the study, we assumed a main hypothesis saying that: “critical path method (CPM) doesn’t help project managers planning and scheduling for their projects.

The Study concluded to the following results: 1- Possibility of using critical path method( CPM) in Libyan constructive projects.

2- Critical path method (CPM) requires specialized high skilled technicians who can properly deal with this method.

Finally the study put forward the following recommendations: 1- Priority of depending on critical path method to substitute methods used now, which are almost limitedly used.

2- Constructive project managers are urged to adopt training programs for its cadre on computerized-based usage of critical path method.

American Psychological Association (APA)

المحياوي، قاسم نايف علوان وعمر، زينب عمر سالم. 2007. استخدام أسلوب المسار الحرج (CPM) في تخطيط و جدولة عمليات المشاريع الإنشائية : دراسة حالة تطبيقية. مجلة الإصلاحات الاقتصادية و الاندماج في الاقتصاد العالمي،مج. 2007، ع. 2، ص ص. 113-134.
https://search.emarefa.net/detail/BIM-833062

Modern Language Association (MLA)

المحياوي، قاسم نايف علوان وعمر، زينب عمر سالم. استخدام أسلوب المسار الحرج (CPM) في تخطيط و جدولة عمليات المشاريع الإنشائية : دراسة حالة تطبيقية. مجلة الإصلاحات الاقتصادية و الاندماج في الاقتصاد العالمي ع. 2 (2007)، ص ص. 113-134.
https://search.emarefa.net/detail/BIM-833062

American Medical Association (AMA)

المحياوي، قاسم نايف علوان وعمر، زينب عمر سالم. استخدام أسلوب المسار الحرج (CPM) في تخطيط و جدولة عمليات المشاريع الإنشائية : دراسة حالة تطبيقية. مجلة الإصلاحات الاقتصادية و الاندماج في الاقتصاد العالمي. 2007. مج. 2007، ع. 2، ص ص. 113-134.
https://search.emarefa.net/detail/BIM-833062

Data Type

Journal Articles

Language

Arabic

Notes

يتضمن مراجع ببليوجرافية : ص. 133-134

Record ID

BIM-833062