أسباب تأخير المشاريع العمومية الإنشائية : دراسة ميدانية لمشاريع السكن و التجهيزات العمومية

Other Title(s)

Delays in public projects : the case of construction projects and public Equipments

Author

ملايكية، عامر

Source

دراسات و أبحاث

Issue

Vol. 10, Issue 3 (30 Sep. 2018), pp.544-564, 21 p.

Publisher

Ziane Achour University of Djelfa

Publication Date

2018-09-30

Country of Publication

Algeria

No. of Pages

21

Main Subjects

Economy and Commerce

Topics

Abstract EN

This study is concerned with an empirical investigation that explores the reasons that have caused the delay in public construction projects in Souk-Ahras.

The data was gathered from a survey of 28 construction firms .

The results of the survey have identified three types of delays: delays caused by bureaucracy of public management, the delays caused by the entrepreneur, and delays caused by external factors.

The results also showed a significant relationship between the three types of delays and experience of the entrepreneur, on the one hand, and between the three types of delays and the project size, on the other

American Psychological Association (APA)

ملايكية، عامر. 2018. أسباب تأخير المشاريع العمومية الإنشائية : دراسة ميدانية لمشاريع السكن و التجهيزات العمومية. دراسات و أبحاث،مج. 10، ع. 3، ص ص. 544-564.
https://search.emarefa.net/detail/BIM-852438

Modern Language Association (MLA)

ملايكية، عامر. أسباب تأخير المشاريع العمومية الإنشائية : دراسة ميدانية لمشاريع السكن و التجهيزات العمومية. دراسات و أبحاث مج. 10، ع. 3 (أيلول 2018)، ص ص. 544-564.
https://search.emarefa.net/detail/BIM-852438

American Medical Association (AMA)

ملايكية، عامر. أسباب تأخير المشاريع العمومية الإنشائية : دراسة ميدانية لمشاريع السكن و التجهيزات العمومية. دراسات و أبحاث. 2018. مج. 10، ع. 3، ص ص. 544-564.
https://search.emarefa.net/detail/BIM-852438

Data Type

Journal Articles

Language

Arabic

Notes

يتضمن مراجع ببليوجرافية.

Record ID

BIM-852438