المبادلة بين الوقت و الكلفة لإدارة المشروع في البيئة الضبابية

Other Title(s)

The time-cost trade-off to manage a project in a fuzzy environment

Joint Authors

وقاص سعد خلف
محنة، رؤيا سرحان

Source

مجلة العلوم الاقتصادية و الإدارية

Issue

Vol. 25, Issue 114 (31 Oct. 2019), pp.498-522, 25 p.

Publisher

University of Baghdad College of Administration and Economics

Publication Date

2019-10-31

Country of Publication

Iraq

No. of Pages

25

Main Subjects

Business Administration

Topics

Abstract EN

In this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated.

The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers.

Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods.

The MS Project was used to find the critical path.

The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and then used another method, the method of time-cost exchange (TCT), which is one of the important techniques used by the project manager to shorten the time of completion of the project at the lowest cost has been achieved This method reduced the implementation time of the project by a large percentage.

The results showed that the implementation period was reduced from (1309.5) days to (1224.2) days, and the cost of completion of (33353514407) dinars, an increase of (240496638) dinars.

American Psychological Association (APA)

وقاص سعد خلف ومحنة، رؤيا سرحان. 2019. المبادلة بين الوقت و الكلفة لإدارة المشروع في البيئة الضبابية. مجلة العلوم الاقتصادية و الإدارية،مج. 25، ع. 114، ص ص. 498-522.
https://search.emarefa.net/detail/BIM-900734

Modern Language Association (MLA)

وقاص سعد خلف ومحنة، رؤيا سرحان. المبادلة بين الوقت و الكلفة لإدارة المشروع في البيئة الضبابية. مجلة العلوم الاقتصادية و الإدارية مج. 25، ع. 114 (2019)، ص ص. 498-522.
https://search.emarefa.net/detail/BIM-900734

American Medical Association (AMA)

وقاص سعد خلف ومحنة، رؤيا سرحان. المبادلة بين الوقت و الكلفة لإدارة المشروع في البيئة الضبابية. مجلة العلوم الاقتصادية و الإدارية. 2019. مج. 25، ع. 114، ص ص. 498-522.
https://search.emarefa.net/detail/BIM-900734

Data Type

Journal Articles

Language

Arabic

Notes

يتضمن مراجع ببليوجرافية : ص. 521

Record ID

BIM-900734