عملية إعادة البناء و التنمية في سوريا
Other Title(s)
The process of rebuilding and development in Syria
Author
Source
Issue
Vol. 1, Issue 4 (31 Dec. 2019), pp.83-104, 22 p.
Publisher
Publication Date
2019-12-31
Country of Publication
Algeria
No. of Pages
22
Main Subjects
Abstract EN
As the war/crises on Syria is approaching its end, there is a need to launch a comprehensive planning process to start rebuilding and developing the Syrian Economy.
This study aims to revising the macroeconomic performance and policies in Syria before and during the crisis, in order to identify the negative implications of those policies and device the right programs to solve them.
Important areas that require special attention is the imbalance in the regional planning process, the lack of national program for economic reform, undetermined identity of the economy, and the vague relationship between public and private sectors.
This study highlights the importance of accomplishing four transitions i.e.
(security, political, social, and economic) to secure success of the rebuilding process.
There also is a long list of important issues to be addressed such as rehabilitating basic infrastructure, corruption and informal sector activities, price distortion, and agricultural and industrial policies, in addition to deal carefully with international involvement in the rebuilding process
American Psychological Association (APA)
هيثم أحمد عيسى. 2019. عملية إعادة البناء و التنمية في سوريا. مجلة بحوث الإدارة و الاقتصاد،مج. 1، ع. 4، ص ص. 83-104.
https://search.emarefa.net/detail/BIM-945147
Modern Language Association (MLA)
هيثم أحمد عيسى. عملية إعادة البناء و التنمية في سوريا. مجلة بحوث الإدارة و الاقتصاد مج. 1، ع. 4 (كانون الأول 2019)، ص ص. 83-104.
https://search.emarefa.net/detail/BIM-945147
American Medical Association (AMA)
هيثم أحمد عيسى. عملية إعادة البناء و التنمية في سوريا. مجلة بحوث الإدارة و الاقتصاد. 2019. مج. 1، ع. 4، ص ص. 83-104.
https://search.emarefa.net/detail/BIM-945147
Data Type
Journal Articles
Language
Arabic
Notes
يتضمن مراجع ببليوجرافية : ص. 101-103
Record ID
BIM-945147