Crossing Reliability of Electric Bike Riders at Urban Intersections

المؤلفون المشاركون

Mei, Huan
Yang, Xiaobao
Jia, Bin

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2013، العدد 2013 (31 ديسمبر/كانون الأول 2013)، ص ص. 1-8، 8ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2013-08-31

دولة النشر

مصر

عدد الصفحات

8

التخصصات الرئيسية

هندسة مدنية

الملخص EN

This paper presents a crossing reliability model of electric bike riders at urban intersections using survival analysis approach.

Riders’ crossing behavior was collected by video cameras.

Waiting times in the red-light phase were modeled by reliability-based model that recognizes the covariate effects.

Three parametric models by the exponential, Weibull, and log-logistic distributions were proposed to analyze when and why electric bike riders cross against the red light.

The results indicate that movement information and situation factors have significant effects on riders’ crossing reliability.

The findings of this paper provide an important demonstration of method and an empirical basis to assess crossing reliability of electric bike riders at the intersection.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Mei, Huan& Yang, Xiaobao& Jia, Bin. 2013. Crossing Reliability of Electric Bike Riders at Urban Intersections. Mathematical Problems in Engineering،Vol. 2013, no. 2013, pp.1-8.
https://search.emarefa.net/detail/BIM-1008469

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Mei, Huan…[et al.]. Crossing Reliability of Electric Bike Riders at Urban Intersections. Mathematical Problems in Engineering No. 2013 (2013), pp.1-8.
https://search.emarefa.net/detail/BIM-1008469

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Mei, Huan& Yang, Xiaobao& Jia, Bin. Crossing Reliability of Electric Bike Riders at Urban Intersections. Mathematical Problems in Engineering. 2013. Vol. 2013, no. 2013, pp.1-8.
https://search.emarefa.net/detail/BIM-1008469

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1008469