Optimal Bandwidth Scheduling of Networked Learning Control System Based on Nash Theory and Auction Mechanism

المؤلفون المشاركون

Yan, Xiang
Li, Hongbo
Wang, Lide
Shen, Ping

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2013، العدد 2013 (31 ديسمبر/كانون الأول 2013)، ص ص. 1-8، 8ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2013-06-12

دولة النشر

مصر

عدد الصفحات

8

التخصصات الرئيسية

هندسة مدنية

الملخص EN

This paper addresses the optimal bandwidth scheduling problem for a double-layer networked learning control system (NLCS).

To deal with this issue, auction mechanism is employed, and a dynamic bandwidth scheduling methodology is proposed to allocate the bandwidth for each subsystem.

A noncooperative game fairness model is formulated, and the utility function of subsystems is designed.

Under this framework, estimation of distribution algorithm (EDA) is used to obtain Nash equilibrium for NLCS.

Finally, simulation and experimental results are given to demonstrate the effectiveness of the proposed approach.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Yan, Xiang& Li, Hongbo& Wang, Lide& Shen, Ping. 2013. Optimal Bandwidth Scheduling of Networked Learning Control System Based on Nash Theory and Auction Mechanism. Mathematical Problems in Engineering،Vol. 2013, no. 2013, pp.1-8.
https://search.emarefa.net/detail/BIM-1009772

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Yan, Xiang…[et al.]. Optimal Bandwidth Scheduling of Networked Learning Control System Based on Nash Theory and Auction Mechanism. Mathematical Problems in Engineering No. 2013 (2013), pp.1-8.
https://search.emarefa.net/detail/BIM-1009772

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Yan, Xiang& Li, Hongbo& Wang, Lide& Shen, Ping. Optimal Bandwidth Scheduling of Networked Learning Control System Based on Nash Theory and Auction Mechanism. Mathematical Problems in Engineering. 2013. Vol. 2013, no. 2013, pp.1-8.
https://search.emarefa.net/detail/BIM-1009772

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1009772