External Economies Evaluation of Wind Power Engineering Project Based on Analytic Hierarchy Process and Matter-Element Extension Model
المؤلفون المشاركون
المصدر
Mathematical Problems in Engineering
العدد
المجلد 2013، العدد 2013 (31 ديسمبر/كانون الأول 2013)، ص ص. 1-11، 11ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2013-12-21
دولة النشر
مصر
عدد الصفحات
11
التخصصات الرئيسية
الملخص EN
The external economies of wind power engineering project may affect the operational efficiency of wind power enterprises and sustainable development of wind power industry.
In order to ensure that the wind power engineering project is constructed and developed in a scientific manner, a reasonable external economies evaluation needs to be performed.
Considering the interaction relationship of the evaluation indices and the ambiguity and uncertainty inherent, a hybrid model of external economies evaluation designed to be applied to wind power engineering project was put forward based on the analytic hierarchy process (AHP) and matter-element extension model in this paper.
The AHP was used to determine the weights of indices, and the matter-element extension model was used to deduce final ranking.
Taking a wind power engineering project in Inner Mongolia city as an example, the external economies evaluation is performed by employing this hybrid model.
The result shows that the external economies of this wind power engineering project are belonged to the “strongest” level, and “the degree of increasing region GDP,” “the degree of reducing pollution gas emissions,” and “the degree of energy conservation” are the sensitive indices.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Li, Hong-ze& Guo, Sen. 2013. External Economies Evaluation of Wind Power Engineering Project Based on Analytic Hierarchy Process and Matter-Element Extension Model. Mathematical Problems in Engineering،Vol. 2013, no. 2013, pp.1-11.
https://search.emarefa.net/detail/BIM-1010944
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Li, Hong-ze& Guo, Sen. External Economies Evaluation of Wind Power Engineering Project Based on Analytic Hierarchy Process and Matter-Element Extension Model. Mathematical Problems in Engineering No. 2013 (2013), pp.1-11.
https://search.emarefa.net/detail/BIM-1010944
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Li, Hong-ze& Guo, Sen. External Economies Evaluation of Wind Power Engineering Project Based on Analytic Hierarchy Process and Matter-Element Extension Model. Mathematical Problems in Engineering. 2013. Vol. 2013, no. 2013, pp.1-11.
https://search.emarefa.net/detail/BIM-1010944
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1010944
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر