A Fuzzy-Neural Ensemble and Geometric Rule Fusion Approach for Scheduling a Wafer Fabrication Factory

المؤلفون المشاركون

Wu, Hsin-Chieh
Toly Chen, Tin-Chih

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2013، العدد 2013 (31 ديسمبر/كانون الأول 2013)، ص ص. 1-14، 14ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2013-07-01

دولة النشر

مصر

عدد الصفحات

14

التخصصات الرئيسية

هندسة مدنية

الملخص EN

In this study, the fuzzy-neural ensemble and geometric rule fusion approach is presented to optimize the performance of job dispatching in a wafer fabrication factory with an intelligent rule.

The proposed methodology is a modification of a previous study by fusing two dispatching rules and diversifying the job slacks in novel ways.

To this end, the geometric mean of the neighboring distances of slacks is maximized.

In addition, the fuzzy c-means (FCM) and backpropagation network (BPN) ensemble approach was also proposed to estimate the remaining cycle time of a job, which is an important input to the new rule.

A new aggregation mechanism was also designed to enhance the robustness of the FCM-BPN ensemble approach.

To validate the effectiveness of the proposed methodology, some experiments have been conducted.

The experimental results did support the effectiveness of the proposed methodology.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Wu, Hsin-Chieh& Toly Chen, Tin-Chih. 2013. A Fuzzy-Neural Ensemble and Geometric Rule Fusion Approach for Scheduling a Wafer Fabrication Factory. Mathematical Problems in Engineering،Vol. 2013, no. 2013, pp.1-14.
https://search.emarefa.net/detail/BIM-1011294

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Wu, Hsin-Chieh& Toly Chen, Tin-Chih. A Fuzzy-Neural Ensemble and Geometric Rule Fusion Approach for Scheduling a Wafer Fabrication Factory. Mathematical Problems in Engineering No. 2013 (2013), pp.1-14.
https://search.emarefa.net/detail/BIM-1011294

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Wu, Hsin-Chieh& Toly Chen, Tin-Chih. A Fuzzy-Neural Ensemble and Geometric Rule Fusion Approach for Scheduling a Wafer Fabrication Factory. Mathematical Problems in Engineering. 2013. Vol. 2013, no. 2013, pp.1-14.
https://search.emarefa.net/detail/BIM-1011294

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1011294