Parallel-Batch Scheduling with Two Models of Deterioration to Minimize the Makespan

المؤلف

Miao, Cuixia

المصدر

Abstract and Applied Analysis

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-10، 10ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-07-22

دولة النشر

مصر

عدد الصفحات

10

التخصصات الرئيسية

الرياضيات

الملخص EN

We consider the bounded parallel-batch scheduling with two models of deterioration, in which the processing time of the first model is pj=aj+αt and of the second model is pj=a+αjt.

The objective is to minimize the makespan.

We present O(n log n) time algorithms for the single-machine problems, respectively.

And we propose fully polynomial time approximation schemes to solve the identical-parallel-machine problem and uniform-parallel-machine problem, respectively.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Miao, Cuixia. 2014. Parallel-Batch Scheduling with Two Models of Deterioration to Minimize the Makespan. Abstract and Applied Analysis،Vol. 2014, no. 2014, pp.1-10.
https://search.emarefa.net/detail/BIM-1014099

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Miao, Cuixia. Parallel-Batch Scheduling with Two Models of Deterioration to Minimize the Makespan. Abstract and Applied Analysis No. 2014 (2014), pp.1-10.
https://search.emarefa.net/detail/BIM-1014099

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Miao, Cuixia. Parallel-Batch Scheduling with Two Models of Deterioration to Minimize the Makespan. Abstract and Applied Analysis. 2014. Vol. 2014, no. 2014, pp.1-10.
https://search.emarefa.net/detail/BIM-1014099

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1014099