A High Performance Load Balance Strategy for Real-Time Multicore Systems

المؤلفون المشاركون

Tsai, Chun-Wei
Cho, Keng-Mao
Chiu, Yi-Shiuan
Yang, Chu-Sing

المصدر

The Scientific World Journal

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-14، 14ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-04-13

دولة النشر

مصر

عدد الصفحات

14

التخصصات الرئيسية

الطب البشري
تكنولوجيا المعلومات وعلم الحاسوب

الملخص EN

Finding ways to distribute workloads to each processor core and efficiently reduce power consumption is of vital importance, especially for real-time systems.

In this paper, a novel scheduling algorithm is proposed for real-time multicore systems to balance the computation loads and save power.

The developed algorithm simultaneously considers multiple criteria, a novel factor, and task deadline, and is called power and deadline-aware multicore scheduling (PDAMS).

Experiment results show that the proposed algorithm can greatly reduce energy consumption by up to 54.2% and the deadline times missed, as compared to the other scheduling algorithms outlined in this paper.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Cho, Keng-Mao& Tsai, Chun-Wei& Chiu, Yi-Shiuan& Yang, Chu-Sing. 2014. A High Performance Load Balance Strategy for Real-Time Multicore Systems. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-14.
https://search.emarefa.net/detail/BIM-1048270

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Cho, Keng-Mao…[et al.]. A High Performance Load Balance Strategy for Real-Time Multicore Systems. The Scientific World Journal No. 2014 (2014), pp.1-14.
https://search.emarefa.net/detail/BIM-1048270

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Cho, Keng-Mao& Tsai, Chun-Wei& Chiu, Yi-Shiuan& Yang, Chu-Sing. A High Performance Load Balance Strategy for Real-Time Multicore Systems. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-14.
https://search.emarefa.net/detail/BIM-1048270

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1048270