Multiple R&D Projects Scheduling Optimization with Improved Particle Swarm Algorithm

المؤلفون المشاركون

Liu, Mengqi
Shan, Miyuan
Wu, Juan

المصدر

The Scientific World Journal

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-7، 7ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-06-12

دولة النشر

مصر

عدد الصفحات

7

التخصصات الرئيسية

الطب البشري
تكنولوجيا المعلومات وعلم الحاسوب

الملخص EN

For most enterprises, in order to win the initiative in the fierce competition of market, a key step is to improve their R&D ability to meet the various demands of customers more timely and less costly.

This paper discusses the features of multiple R&D environments in large make-to-order enterprises under constrained human resource and budget, and puts forward a multi-project scheduling model during a certain period.

Furthermore, we make some improvements to existed particle swarm algorithm and apply the one developed here to the resource-constrained multi-project scheduling model for a simulation experiment.

Simultaneously, the feasibility of model and the validity of algorithm are proved in the experiment.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Liu, Mengqi& Shan, Miyuan& Wu, Juan. 2014. Multiple R&D Projects Scheduling Optimization with Improved Particle Swarm Algorithm. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1050514

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Liu, Mengqi…[et al.]. Multiple R&D Projects Scheduling Optimization with Improved Particle Swarm Algorithm. The Scientific World Journal No. 2014 (2014), pp.1-7.
https://search.emarefa.net/detail/BIM-1050514

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Liu, Mengqi& Shan, Miyuan& Wu, Juan. Multiple R&D Projects Scheduling Optimization with Improved Particle Swarm Algorithm. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-7.
https://search.emarefa.net/detail/BIM-1050514

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1050514