A Collaborative Scheduling Model for the Supply-Hub with Multiple Suppliers and Multiple Manufacturers

المؤلفون المشاركون

Li, Guo
Lv, Fei
Guan, Xu

المصدر

The Scientific World Journal

العدد

المجلد 2014، العدد 2014 (31 ديسمبر/كانون الأول 2014)، ص ص. 1-12، 12ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2014-04-15

دولة النشر

مصر

عدد الصفحات

12

التخصصات الرئيسية

الطب البشري
تكنولوجيا المعلومات وعلم الحاسوب

الملخص EN

This paper investigates a collaborative scheduling model in the assembly system, wherein multiple suppliers have to deliver their components to the multiple manufacturers under the operation of Supply-Hub.

We first develop two different scenarios to examine the impact of Supply-Hub.

One is that suppliers and manufacturers make their decisions separately, and the other is that the Supply-Hub makes joint decisions with collaborative scheduling.

The results show that our scheduling model with the Supply-Hub is a NP-complete problem, therefore, we propose an auto-adapted differential evolution algorithm to solve this problem.

Moreover, we illustrate that the performance of collaborative scheduling by the Supply-Hub is superior to separate decision made by each manufacturer and supplier.

Furthermore, we also show that the algorithm proposed has good convergence and reliability, which can be applicable to more complicated supply chain environment.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Li, Guo& Lv, Fei& Guan, Xu. 2014. A Collaborative Scheduling Model for the Supply-Hub with Multiple Suppliers and Multiple Manufacturers. The Scientific World Journal،Vol. 2014, no. 2014, pp.1-12.
https://search.emarefa.net/detail/BIM-1051492

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Li, Guo…[et al.]. A Collaborative Scheduling Model for the Supply-Hub with Multiple Suppliers and Multiple Manufacturers. The Scientific World Journal No. 2014 (2014), pp.1-12.
https://search.emarefa.net/detail/BIM-1051492

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Li, Guo& Lv, Fei& Guan, Xu. A Collaborative Scheduling Model for the Supply-Hub with Multiple Suppliers and Multiple Manufacturers. The Scientific World Journal. 2014. Vol. 2014, no. 2014, pp.1-12.
https://search.emarefa.net/detail/BIM-1051492

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1051492