Construction Technique of Long-Span Shallow-Buried Tunnel Considering the Optimal Sequence of Pilot-Tunnel Excavation

المؤلفون المشاركون

Liu, Yang
Jin, Bao
Yang, Changxi
Tan, Zhicheng
Zhang, Jianyang

المصدر

Advances in Materials Science and Engineering

العدد

المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-8، 8ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2015-10-04

دولة النشر

مصر

عدد الصفحات

8

الملخص EN

Construction technique considering the optimal sequence of pilot-tunnel excavation was investigated in order to ensure the safety of construction process of long-span shallow-buried tunnel.

Firstly, optimal comparisons of the effect of different sequence of pilot-tunnel excavation on the ground settlement were implemented by the numerical analysis.

Secondly, an optimal construction method was determined and applied to the construction of a practical tunnel.

Some key issues and procedure of the selected construction method were described in detail.

Finally, the numerical modeling and calculation of the tunnel construction process were conducted, and the effectiveness of these simulations was demonstrated by using the measured data of the practical tunnel.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Jin, Bao& Liu, Yang& Yang, Changxi& Tan, Zhicheng& Zhang, Jianyang. 2015. Construction Technique of Long-Span Shallow-Buried Tunnel Considering the Optimal Sequence of Pilot-Tunnel Excavation. Advances in Materials Science and Engineering،Vol. 2015, no. 2015, pp.1-8.
https://search.emarefa.net/detail/BIM-1053315

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Jin, Bao…[et al.]. Construction Technique of Long-Span Shallow-Buried Tunnel Considering the Optimal Sequence of Pilot-Tunnel Excavation. Advances in Materials Science and Engineering No. 2015 (2015), pp.1-8.
https://search.emarefa.net/detail/BIM-1053315

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Jin, Bao& Liu, Yang& Yang, Changxi& Tan, Zhicheng& Zhang, Jianyang. Construction Technique of Long-Span Shallow-Buried Tunnel Considering the Optimal Sequence of Pilot-Tunnel Excavation. Advances in Materials Science and Engineering. 2015. Vol. 2015, no. 2015, pp.1-8.
https://search.emarefa.net/detail/BIM-1053315

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1053315