Hybrid Particle Swarm and Differential Evolution Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem

المؤلفون المشاركون

Zhang, Lieping
Luo, Yingxiong
Zhang, Yu

المصدر

Journal of Control Science and Engineering

العدد

المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-6، 6ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2015-10-05

دولة النشر

مصر

عدد الصفحات

6

التخصصات الرئيسية

هندسة كهربائية
تكنولوجيا المعلومات وعلم الحاسوب

الملخص EN

In order to find a feasible solution for the multimode resource-constrained project scheduling problem (MRCPSP), a hybrid of particle swarm optimization (PSO) and differential evolution (DE) algorithm is proposed in this paper.

The proposed algorithm uses a two-level coding structure.

The upper-level structure is coded for scheduling sequence, which is optimized by PSO algorithm.

The lower-level structure is coded for project execution mode, and DE algorithm is used to solve the optimal scheduling model.

The effectiveness and advantages of the proposed algorithm are illustrated by using the test function of project scheduling problem library (PSPLIB) and comparing with other scheduling methods.

The results show that the proposed algorithm can well solve MRCPSP.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Zhang, Lieping& Luo, Yingxiong& Zhang, Yu. 2015. Hybrid Particle Swarm and Differential Evolution Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem. Journal of Control Science and Engineering،Vol. 2015, no. 2015, pp.1-6.
https://search.emarefa.net/detail/BIM-1067814

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Zhang, Lieping…[et al.]. Hybrid Particle Swarm and Differential Evolution Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem. Journal of Control Science and Engineering No. 2015 (2015), pp.1-6.
https://search.emarefa.net/detail/BIM-1067814

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Zhang, Lieping& Luo, Yingxiong& Zhang, Yu. Hybrid Particle Swarm and Differential Evolution Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem. Journal of Control Science and Engineering. 2015. Vol. 2015, no. 2015, pp.1-6.
https://search.emarefa.net/detail/BIM-1067814

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1067814