The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model
المؤلفون المشاركون
Toledo, Claudio F. M.
Kimms, Alf
França, Paulo M.
Morabito, Reinaldo
المصدر
Mathematical Problems in Engineering
العدد
المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-18، 18ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2015-07-09
دولة النشر
مصر
عدد الصفحات
18
التخصصات الرئيسية
الملخص EN
This paper presents the synchronized and integrated two-level lot sizing and scheduling problem (SITLSP).
This problem is found in beverage production, foundry, glass industry, and electrofused grains, where the production processes have usually two interdependent levels with sequence-dependent setups in each level.
For instance, in the first level of soft drink production, raw materials are stored in tanks flowing to production lines in the second level.
The amount and the time the raw materials and products have to be stored and produced should be determined.
A synchronization problem occurs because the production in lines and the storage in tanks have to be compatible with each other throughout the time horizon.
The SITLSP and its mathematical model are described in detail by this paper.
The lack of similar models in the literature has led us to also propose a set of instances for the SITLSP, based on data provided by a soft drink company.
Thus, a set of benchmark results for these problem instances are established using an exact method available in an optimization package.
Moreover, results for two relaxations proved that the modeling methodology could be useful in real-world applications.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Toledo, Claudio F. M.& Kimms, Alf& França, Paulo M.& Morabito, Reinaldo. 2015. The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-18.
https://search.emarefa.net/detail/BIM-1073151
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Toledo, Claudio F. M.…[et al.]. The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model. Mathematical Problems in Engineering No. 2015 (2015), pp.1-18.
https://search.emarefa.net/detail/BIM-1073151
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Toledo, Claudio F. M.& Kimms, Alf& França, Paulo M.& Morabito, Reinaldo. The Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem: Evaluating the Generalized Mathematical Model. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-18.
https://search.emarefa.net/detail/BIM-1073151
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1073151
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر