The Newsvendor Problem with Different Delivery Time, Resalable Returns, and an Additional Order

المؤلفون المشاركون

Zheng, Jin-hui
Zeng, Fue
Chi, Yunjia

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-10، 10ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2015-01-26

دولة النشر

مصر

عدد الصفحات

10

التخصصات الرئيسية

هندسة مدنية

الملخص EN

In a B2C scenario, the retailer is confronted with two kinds of demand.

One requires an immediate delivery after placing an order, while the other prefers a delayed shipment due to some personal reasons.

Considering demands for different delivery time, we explore a newsvendor model with resalable returns and an additional order to optimize the procurement decision under a stochastic demand distribution.

The impact of the proportion of the instant delivery needs and the return rate on the order quantity and the expected profit is illustrated through numerical tests.

It is shown that the expected profit decreases as the ratios of immediate delivery needs and returned products increase.

Besides, if the sum of the percentage of the instant delivery needs and the return rate is less than 1, the expected profit is always greater than the result if the sum of them is equal to or greater than 1.

Management implications are also discussed.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Zeng, Fue& Chi, Yunjia& Zheng, Jin-hui. 2015. The Newsvendor Problem with Different Delivery Time, Resalable Returns, and an Additional Order. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-10.
https://search.emarefa.net/detail/BIM-1073997

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Zeng, Fue…[et al.]. The Newsvendor Problem with Different Delivery Time, Resalable Returns, and an Additional Order. Mathematical Problems in Engineering No. 2015 (2015), pp.1-10.
https://search.emarefa.net/detail/BIM-1073997

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Zeng, Fue& Chi, Yunjia& Zheng, Jin-hui. The Newsvendor Problem with Different Delivery Time, Resalable Returns, and an Additional Order. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-10.
https://search.emarefa.net/detail/BIM-1073997

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1073997