Single-Machine Scheduling with Workload-Dependent Maintenance Duration to Minimize Maximum Lateness

المؤلفون المشاركون

Xu, Dehua
Wang, Ting

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-5، 5ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2015-07-28

دولة النشر

مصر

عدد الصفحات

5

التخصصات الرئيسية

هندسة مدنية

الملخص EN

A single-machine scheduling problem with a mandatory maintenance whose duration is workload-dependent is considered.

The start time of the maintenance is restricted to a time window.

The objective is to determine the start time of the maintenance and schedule all the jobs to the machine such that the maximum lateness is minimized.

An approximation algorithm based on the classical Earliest Due Date first rule is proposed.

It is showed that the proposed algorithm is optimal for some special cases and that it has a tight bound for the scheduling problem under consideration.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Wang, Ting& Xu, Dehua. 2015. Single-Machine Scheduling with Workload-Dependent Maintenance Duration to Minimize Maximum Lateness. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-5.
https://search.emarefa.net/detail/BIM-1074606

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Wang, Ting& Xu, Dehua. Single-Machine Scheduling with Workload-Dependent Maintenance Duration to Minimize Maximum Lateness. Mathematical Problems in Engineering No. 2015 (2015), pp.1-5.
https://search.emarefa.net/detail/BIM-1074606

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Wang, Ting& Xu, Dehua. Single-Machine Scheduling with Workload-Dependent Maintenance Duration to Minimize Maximum Lateness. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-5.
https://search.emarefa.net/detail/BIM-1074606

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1074606