Taxiing Route Scheduling between Taxiway and Runway in Hub Airport

المؤلفون المشاركون

Jiang, Yu
Zhang, Honghai
Xu, Xinxing
Luo, Yuxiao

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-14، 14ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2015-03-17

دولة النشر

مصر

عدد الصفحات

14

التخصصات الرئيسية

هندسة مدنية

الملخص EN

To guarantee the operation safety of airport, improve the efficiency of surface operation, and enhance the fairness of taxiing route scheduling, an optimizing model is established for the airport surface taxiing route scheduling.

Reducing the total aircraft taxiing route length and reducing the waiting delay time are the goals of the model by controlling the initial taxiing time of aircraft and choosing the right taxiing route.

The model can guarantee the continuous taxiing for all aircraft without conflicts.

The runway scheduling is taken into consideration in the model to optimize the surface operation.

The improved genetic algorithm is designed for simulation and validation.

The simulation results show that compared with the ant colony optimization method, the improved genetic algorithm reduces the total extra taxiing distance by 47.8% and the total waiting delay time decreases by 21.5%.

The optimization model and improved genetic algorithm are feasible.

The optimization of taxiing route method can provide decision support for hub airports.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Jiang, Yu& Xu, Xinxing& Zhang, Honghai& Luo, Yuxiao. 2015. Taxiing Route Scheduling between Taxiway and Runway in Hub Airport. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-14.
https://search.emarefa.net/detail/BIM-1075077

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Jiang, Yu…[et al.]. Taxiing Route Scheduling between Taxiway and Runway in Hub Airport. Mathematical Problems in Engineering No. 2015 (2015), pp.1-14.
https://search.emarefa.net/detail/BIM-1075077

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Jiang, Yu& Xu, Xinxing& Zhang, Honghai& Luo, Yuxiao. Taxiing Route Scheduling between Taxiway and Runway in Hub Airport. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-14.
https://search.emarefa.net/detail/BIM-1075077

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1075077