An EPQ Model for Deteriorating Production System and Items with Rework

المؤلفون المشاركون

Chan, Felix T. S.
Li, N.
Chung, S. H.
Tai, Allen H.

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-10، 10ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2015-02-25

دولة النشر

مصر

عدد الصفحات

10

التخصصات الرئيسية

هندسة مدنية

الملخص EN

This paper investigates the economic production quantity model jointly considering product deterioration and a deteriorating production system with rework.

In this imperfect deteriorating production system, not only does the machine produce defective product but also the machine is subjected to quality deterioration.

To be more specific, the defective rate increases at certain time intervals.

The defects produced are stored until the end of normal production process.

Then they are reworked with extra cost to restore their quality and regarded as perfect product.

The main objective is to minimize the total cost per unit product by determining the optimal combination of production run time and backlog quantity.

Numerical experiments are carried out to illustrate the behavior of the inventory and show the impact of different parameters on the model.

Discussion and conclusions are made at the end of the paper.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Li, N.& Chan, Felix T. S.& Chung, S. H.& Tai, Allen H.. 2015. An EPQ Model for Deteriorating Production System and Items with Rework. Mathematical Problems in Engineering،Vol. 2015, no. 2015, pp.1-10.
https://search.emarefa.net/detail/BIM-1075187

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Li, N.…[et al.]. An EPQ Model for Deteriorating Production System and Items with Rework. Mathematical Problems in Engineering No. 2015 (2015), pp.1-10.
https://search.emarefa.net/detail/BIM-1075187

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Li, N.& Chan, Felix T. S.& Chung, S. H.& Tai, Allen H.. An EPQ Model for Deteriorating Production System and Items with Rework. Mathematical Problems in Engineering. 2015. Vol. 2015, no. 2015, pp.1-10.
https://search.emarefa.net/detail/BIM-1075187

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1075187