LPV Control for the Full Region Operation of a Wind Turbine Integrated with Synchronous Generator

المؤلفون المشاركون

Cao, Guoyan
Grigoriadis, Karolos M.
Nyanteh, Yaw D.

المصدر

The Scientific World Journal

العدد

المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-15، 15ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2015-03-22

دولة النشر

مصر

عدد الصفحات

15

التخصصات الرئيسية

الطب البشري
تكنولوجيا المعلومات وعلم الحاسوب

الملخص EN

Wind turbine conversion systems require feedback control to achieve reliable wind turbine operation and stable current supply.

A robust linear parameter varying (LPV) controller is proposed to reduce the structural loads and improve the power extraction of a horizontal axis wind turbine operating in both the partial load and the full load regions.

The LPV model is derived from the wind turbine state space models extracted by FAST (fatigue, aerodynamics, structural, and turbulence) code linearization at different operating points.

In order to assure a smooth transition between the two regions, appropriate frequency-dependent varying scaling parametric weighting functions are designed in the LPV control structure.

The solution of a set of linear matrix inequalities (LMIs) leads to the LPV controller.

A synchronous generator model is connected with the closed LPV control loop for examining the electrical subsystem performance obtained by an inner speed control loop.

Simulation results of a 1.5 MW horizontal axis wind turbine model on the FAST platform illustrates the benefit of the LPV control and demonstrates the advantages of this proposed LPV controller, when compared with a traditional gain scheduling PI control and prior LPV control configurations.

Enhanced structural load mitigation, improved power extraction, and good current performance were obtained from the proposed LPV control.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Cao, Guoyan& Grigoriadis, Karolos M.& Nyanteh, Yaw D.. 2015. LPV Control for the Full Region Operation of a Wind Turbine Integrated with Synchronous Generator. The Scientific World Journal،Vol. 2015, no. 2015, pp.1-15.
https://search.emarefa.net/detail/BIM-1078953

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Cao, Guoyan…[et al.]. LPV Control for the Full Region Operation of a Wind Turbine Integrated with Synchronous Generator. The Scientific World Journal No. 2015 (2015), pp.1-15.
https://search.emarefa.net/detail/BIM-1078953

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Cao, Guoyan& Grigoriadis, Karolos M.& Nyanteh, Yaw D.. LPV Control for the Full Region Operation of a Wind Turbine Integrated with Synchronous Generator. The Scientific World Journal. 2015. Vol. 2015, no. 2015, pp.1-15.
https://search.emarefa.net/detail/BIM-1078953

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1078953