![](/images/graphics-bg.png)
Integrated Production and Distribution Scheduling Problems Related to Fixed Delivery Departure Dates and Weights of Late Orders
المؤلفون المشاركون
المصدر
العدد
المجلد 2015، العدد 2015 (31 ديسمبر/كانون الأول 2015)، ص ص. 1-7، 7ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2015-02-16
دولة النشر
مصر
عدد الصفحات
7
التخصصات الرئيسية
الطب البشري
تكنولوجيا المعلومات وعلم الحاسوب
الملخص EN
We consider an integrated production and distribution scheduling problem faced by a typical make-to-order manufacturer which relies on a third-party logistics (3PL) provider for finished product delivery to customers.
In the beginning of a planning horizon, the manufacturer has received a set of orders to be processed on a single production line.
Completed orders are delivered to customers by a finite number of vehicles provided by the 3PL company which follows a fixed daily or weekly shipping schedule such that the vehicles have fixed departure dates which are not part of the decisions.
The problem is to find a feasible schedule that minimizes one of the following objective functions when processing times and weights are oppositely ordered: (1) the total weight of late orders and (2) the number of vehicles used subject to the condition that the total weight of late orders is minimum.
We show that both problems are solvable in polynomial time.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Li, Shanlin& Li, Maoqin. 2015. Integrated Production and Distribution Scheduling Problems Related to Fixed Delivery Departure Dates and Weights of Late Orders. The Scientific World Journal،Vol. 2015, no. 2015, pp.1-7.
https://search.emarefa.net/detail/BIM-1079155
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Li, Shanlin& Li, Maoqin. Integrated Production and Distribution Scheduling Problems Related to Fixed Delivery Departure Dates and Weights of Late Orders. The Scientific World Journal No. 2015 (2015), pp.1-7.
https://search.emarefa.net/detail/BIM-1079155
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Li, Shanlin& Li, Maoqin. Integrated Production and Distribution Scheduling Problems Related to Fixed Delivery Departure Dates and Weights of Late Orders. The Scientific World Journal. 2015. Vol. 2015, no. 2015, pp.1-7.
https://search.emarefa.net/detail/BIM-1079155
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1079155
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)