A Cost Optimization Model for Multiresource Leveling Problem without Project Duration Constraint

المؤلفون المشاركون

Yan, Qingyou
Zhang, Qian
Zou, Xin

المصدر

Discrete Dynamics in Nature and Society

العدد

المجلد 2016، العدد 2016 (31 ديسمبر/كانون الأول 2016)، ص ص. 1-8، 8ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2016-07-18

دولة النشر

مصر

عدد الصفحات

8

التخصصات الرئيسية

الرياضيات

الملخص EN

The study of traditional resource leveling problem aims at minimizing the resource usage fluctuations and obtaining sustainable resource supplement, which is accomplished by adjusting noncritical activities within their start and finish time.

However, there exist limitations in terms of the traditional resource leveling problem based on the fixed project duration.

This paper assumes that the duration can be changed in a certain range and then analyzes the relationship between the scarce resource usage fluctuations and project cost.

This paper proposes an optimization model for the multiresource leveling problem.

We take into consideration five kinds of cost: the extra hire cost when the resource demand is greater than the resource available amount, the idle cost of resource when the resource available amount is greater than the resource demand, the indirect cost related to the duration, the liquidated damages when the project duration is extended, and the incentive fee when the project duration is reduced.

The optimal objective of this model is to minimize the sum of the aforementioned five kinds of cost.

Finally, a case study is examined to highlight the characteristic of the proposed model at the end of this paper.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Yan, Qingyou& Zhang, Qian& Zou, Xin. 2016. A Cost Optimization Model for Multiresource Leveling Problem without Project Duration Constraint. Discrete Dynamics in Nature and Society،Vol. 2016, no. 2016, pp.1-8.
https://search.emarefa.net/detail/BIM-1103328

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Yan, Qingyou…[et al.]. A Cost Optimization Model for Multiresource Leveling Problem without Project Duration Constraint. Discrete Dynamics in Nature and Society No. 2016 (2016), pp.1-8.
https://search.emarefa.net/detail/BIM-1103328

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Yan, Qingyou& Zhang, Qian& Zou, Xin. A Cost Optimization Model for Multiresource Leveling Problem without Project Duration Constraint. Discrete Dynamics in Nature and Society. 2016. Vol. 2016, no. 2016, pp.1-8.
https://search.emarefa.net/detail/BIM-1103328

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1103328