Multidimensional and Interactive Assessment Model of Large-Scale Infrastructure Project and Its Demonstration Based on Double Utility

المؤلفون المشاركون

Gao, Wu
Pan, Bin
Hong, Kairong

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2016، العدد 2016 (31 ديسمبر/كانون الأول 2016)، ص ص. 1-11، 11ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2016-07-20

دولة النشر

مصر

عدد الصفحات

11

التخصصات الرئيسية

هندسة مدنية

الملخص EN

This paper evaluates the project risks with a multidimensional and interactive model from multiagent and utility combination, which takes subjective psychological negative utility into account rather than only focusing on the thinking pattern of objective value loss.

Firstly, it analyzes the bodies’ heterogeneous preference and their game behavior using game theory application methods.

Secondly, it builds multidimensional and interactive evaluation model of large-scale infrastructure project from many dimensions, such as risk rate, objective utility, and subjective utility.

It reflects different values and behavior strategy interdynamic factor in the design of risk utility function.

Lastly, it deduces process and approaches of multidimensional and interactive evaluation by typical project.

In addition, it tests model parameter with regression analysis.

The research of this paper broadens the dimension of project risk evaluation and provides comprehensive and balanced reference for the measure of project risk utility and a better basis for project risk control.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Gao, Wu& Hong, Kairong& Pan, Bin. 2016. Multidimensional and Interactive Assessment Model of Large-Scale Infrastructure Project and Its Demonstration Based on Double Utility. Mathematical Problems in Engineering،Vol. 2016, no. 2016, pp.1-11.
https://search.emarefa.net/detail/BIM-1112311

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Gao, Wu…[et al.]. Multidimensional and Interactive Assessment Model of Large-Scale Infrastructure Project and Its Demonstration Based on Double Utility. Mathematical Problems in Engineering No. 2016 (2016), pp.1-11.
https://search.emarefa.net/detail/BIM-1112311

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Gao, Wu& Hong, Kairong& Pan, Bin. Multidimensional and Interactive Assessment Model of Large-Scale Infrastructure Project and Its Demonstration Based on Double Utility. Mathematical Problems in Engineering. 2016. Vol. 2016, no. 2016, pp.1-11.
https://search.emarefa.net/detail/BIM-1112311

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1112311