Multidimensional and Interactive Assessment Model of Large-Scale Infrastructure Project and Its Demonstration Based on Double Utility
المؤلفون المشاركون
المصدر
Mathematical Problems in Engineering
العدد
المجلد 2016، العدد 2016 (31 ديسمبر/كانون الأول 2016)، ص ص. 1-11، 11ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2016-07-20
دولة النشر
مصر
عدد الصفحات
11
التخصصات الرئيسية
الملخص EN
This paper evaluates the project risks with a multidimensional and interactive model from multiagent and utility combination, which takes subjective psychological negative utility into account rather than only focusing on the thinking pattern of objective value loss.
Firstly, it analyzes the bodies’ heterogeneous preference and their game behavior using game theory application methods.
Secondly, it builds multidimensional and interactive evaluation model of large-scale infrastructure project from many dimensions, such as risk rate, objective utility, and subjective utility.
It reflects different values and behavior strategy interdynamic factor in the design of risk utility function.
Lastly, it deduces process and approaches of multidimensional and interactive evaluation by typical project.
In addition, it tests model parameter with regression analysis.
The research of this paper broadens the dimension of project risk evaluation and provides comprehensive and balanced reference for the measure of project risk utility and a better basis for project risk control.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Gao, Wu& Hong, Kairong& Pan, Bin. 2016. Multidimensional and Interactive Assessment Model of Large-Scale Infrastructure Project and Its Demonstration Based on Double Utility. Mathematical Problems in Engineering،Vol. 2016, no. 2016, pp.1-11.
https://search.emarefa.net/detail/BIM-1112311
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Gao, Wu…[et al.]. Multidimensional and Interactive Assessment Model of Large-Scale Infrastructure Project and Its Demonstration Based on Double Utility. Mathematical Problems in Engineering No. 2016 (2016), pp.1-11.
https://search.emarefa.net/detail/BIM-1112311
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Gao, Wu& Hong, Kairong& Pan, Bin. Multidimensional and Interactive Assessment Model of Large-Scale Infrastructure Project and Its Demonstration Based on Double Utility. Mathematical Problems in Engineering. 2016. Vol. 2016, no. 2016, pp.1-11.
https://search.emarefa.net/detail/BIM-1112311
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1112311
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر