A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness

المؤلفون المشاركون

Bang, June-Young
Lee, Ju-Yong

المصدر

Mathematical Problems in Engineering

العدد

المجلد 2016، العدد 2016 (31 ديسمبر/كانون الأول 2016)، ص ص. 1-10، 10ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2016-07-18

دولة النشر

مصر

عدد الصفحات

10

التخصصات الرئيسية

هندسة مدنية

الملخص EN

This research considers a two-stage assembly-type flowshop scheduling problem with the objective of minimizing the total tardiness.

The first stage consists of two independent machines, and the second stage consists of a single machine.

Two types of components are fabricated in the first stage, and then they are assembled in the second stage.

Dominance properties and lower bounds are developed, and a branch and bound algorithm is presented that uses these properties and lower bounds as well as an upper bound obtained from a heuristic algorithm.

The algorithm performance is evaluated using a series of computational experiments on randomly generated instances and the results are reported.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Lee, Ju-Yong& Bang, June-Young. 2016. A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness. Mathematical Problems in Engineering،Vol. 2016, no. 2016, pp.1-10.
https://search.emarefa.net/detail/BIM-1112452

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Lee, Ju-Yong& Bang, June-Young. A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness. Mathematical Problems in Engineering No. 2016 (2016), pp.1-10.
https://search.emarefa.net/detail/BIM-1112452

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Lee, Ju-Yong& Bang, June-Young. A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness. Mathematical Problems in Engineering. 2016. Vol. 2016, no. 2016, pp.1-10.
https://search.emarefa.net/detail/BIM-1112452

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1112452