Integration of BIM and Energy Consumption Modelling for Manufacturing Prefabricated Components: A Case Study in China

المؤلفون المشاركون

Xu, Zhao
Wang, Shaozhe
Wang, Endong

المصدر

Advances in Civil Engineering

العدد

المجلد 2019، العدد 2019 (31 ديسمبر/كانون الأول 2019)، ص ص. 1-18، 18ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2019-11-14

دولة النشر

مصر

عدد الصفحات

18

التخصصات الرئيسية

هندسة مدنية

الملخص EN

Prefabrication is undergoing significant growth in the building and construction sector in China.

Meanwhile, the integrated measurement and reduction solution for energy consumption is quickly becoming an important target of scientific efforts and research, especially in prefabricated buildings.

Embedded energy consumption requirements can potentially be reduced during the manufacturing process of prefabricated components: the opportunity for its reduction can be significant.

This paper aims to propose a BIM and LCA integrated approach that enables the energy consumption of prefabricated components in the manufacturing stage to be extracted and calculated in order to obtain a clear, precise understanding of the energy consumption management in prefabrication.

To enhance the energy consumption description of prefabricated components, this paper clarifies the contents of energy consumption inventory and related calculation formula in raw material extraction and production, material transportation, and factorized production of prefabricated components, respectively.

Specifically, considering that current Industry Foundation Classes (IFC) standard does not accommodate entities with energy consumption information or relationships, it applies the IFC extension method to connect the energy consumption inventory with the BIM model.

The proposed approach is applied and verified in a case study from China.

This study reveals that energy consumption control should be investigated in the element level considering the differences of various prefabricated components’ requirements in the manufacturing stage.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Xu, Zhao& Wang, Shaozhe& Wang, Endong. 2019. Integration of BIM and Energy Consumption Modelling for Manufacturing Prefabricated Components: A Case Study in China. Advances in Civil Engineering،Vol. 2019, no. 2019, pp.1-18.
https://search.emarefa.net/detail/BIM-1115539

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Xu, Zhao…[et al.]. Integration of BIM and Energy Consumption Modelling for Manufacturing Prefabricated Components: A Case Study in China. Advances in Civil Engineering No. 2019 (2019), pp.1-18.
https://search.emarefa.net/detail/BIM-1115539

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Xu, Zhao& Wang, Shaozhe& Wang, Endong. Integration of BIM and Energy Consumption Modelling for Manufacturing Prefabricated Components: A Case Study in China. Advances in Civil Engineering. 2019. Vol. 2019, no. 2019, pp.1-18.
https://search.emarefa.net/detail/BIM-1115539

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1115539