![](/images/graphics-bg.png)
BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea
المؤلفون المشاركون
Ahn, Yong Han
Ham, Namhyuk
Lee, Joo-sung
Kwon, Nahyun
Kim, Jae-jun
المصدر
العدد
المجلد 2019، العدد 2019 (31 ديسمبر/كانون الأول 2019)، ص ص. 1-18، 18ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2019-05-23
دولة النشر
مصر
عدد الصفحات
18
التخصصات الرئيسية
الملخص EN
Since the concept of building information modeling (BIM) was introduced in South Korea in 2008, digital fabrication concerning free-form shapes and complex parametric information has been expanding owing to the development of BIM software and tools.
However, the digital fabrication process is inadequate in terms of efficiency and productivity because of the need to convert from conventional two-dimensional (2D) drawings to a BIM design; this adversely affects the unified design, fabrication, installation, and inspection processes.
Moreover, an optimized process has not been developed thus far because the productivity of digital fabrication has not been quantitatively verified for various projects in the field.
This study proposes a BIM-based digital fabrication process for prefabricated parts of buildings.
In addition, a productivity analysis method based on the queuing model is proposed using personnel input and performance calculation data to verify productivity.
It is expected that the digital fabrication process and productivity analysis model proposed here will be applied to complex digital fabrication works.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Lee, Joo-sung& Kwon, Nahyun& Ham, Namhyuk& Kim, Jae-jun& Ahn, Yong Han. 2019. BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea. Advances in Civil Engineering،Vol. 2019, no. 2019, pp.1-18.
https://search.emarefa.net/detail/BIM-1116144
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Lee, Joo-sung…[et al.]. BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea. Advances in Civil Engineering No. 2019 (2019), pp.1-18.
https://search.emarefa.net/detail/BIM-1116144
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Lee, Joo-sung& Kwon, Nahyun& Ham, Namhyuk& Kim, Jae-jun& Ahn, Yong Han. BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea. Advances in Civil Engineering. 2019. Vol. 2019, no. 2019, pp.1-18.
https://search.emarefa.net/detail/BIM-1116144
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1116144
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
![](/images/ebook-kashef.png)
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر
![](/images/kashef-image.png)