Monitoring and Analysis of Ground Settlement Induced by Tunnelling with Slurry Pressure-Balanced Tunnel Boring Machine

المؤلفون المشاركون

Park, Hyunku
Oh, Ju-Young
Kim, Dohyung
Chang, Seokbue

المصدر

Advances in Civil Engineering

العدد

المجلد 2018، العدد 2018 (31 ديسمبر/كانون الأول 2018)، ص ص. 1-10، 10ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2018-04-11

دولة النشر

مصر

عدد الصفحات

10

التخصصات الرئيسية

هندسة مدنية

الملخص EN

A case study of monitoring and analysis of ground settlement caused by tunnelling of stacked twin tunnels for underground metro line construction through the densely populated area using the slurry pressure-balanced TBM is presented.

Detailed ground settlement monitoring was carried out for the initial stage of down-track tunnelling in order to estimate trough width factor and volume losses including face, shield, and tail losses.

In addition, using the gap model, prediction of volume loss and ground settlement was carried out with consideration of the ground condition, TBM configurations, and actual operation data.

The predictions of the gap model were compared with the observed results, and adjustment factors were determined for volume loss estimation.

The adjusted factors were applied to predict ground settlement of the up-track tunnel, and its results were compared with the field measurements.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Park, Hyunku& Oh, Ju-Young& Kim, Dohyung& Chang, Seokbue. 2018. Monitoring and Analysis of Ground Settlement Induced by Tunnelling with Slurry Pressure-Balanced Tunnel Boring Machine. Advances in Civil Engineering،Vol. 2018, no. 2018, pp.1-10.
https://search.emarefa.net/detail/BIM-1116290

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Park, Hyunku…[et al.]. Monitoring and Analysis of Ground Settlement Induced by Tunnelling with Slurry Pressure-Balanced Tunnel Boring Machine. Advances in Civil Engineering No. 2018 (2018), pp.1-10.
https://search.emarefa.net/detail/BIM-1116290

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Park, Hyunku& Oh, Ju-Young& Kim, Dohyung& Chang, Seokbue. Monitoring and Analysis of Ground Settlement Induced by Tunnelling with Slurry Pressure-Balanced Tunnel Boring Machine. Advances in Civil Engineering. 2018. Vol. 2018, no. 2018, pp.1-10.
https://search.emarefa.net/detail/BIM-1116290

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1116290