Accurate Method for Picking Up the First Arrival Time of Microseismic Signals Based on Entropy Theory

المؤلفون المشاركون

Jia, Bao-xin
Pan, Yi-shan
Chen, Hao
Sun, Ao
Liu, Feng-pu

المصدر

Advances in Civil Engineering

العدد

المجلد 2019، العدد 2019 (31 ديسمبر/كانون الأول 2019)، ص ص. 1-17، 17ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2019-03-18

دولة النشر

مصر

عدد الصفحات

17

التخصصات الرئيسية

هندسة مدنية

الملخص EN

The entropy method describes the change in the signal state from a macroscopic angle and weakens the interference generated by random noise.

From the angle of chaos, which describes the first arrival of microseismic signals, it predicts the trend of noise entropy based on the grey theory.

The results indicate that the entropy method is sensitive to amplitude, frequency, and seismic phase changes.

Compared with traditional methods, the entropy method has better noise immunity.

In terms of the influence of the pickup parameter on the resulting error, the entropy method demonstrated the best result and produces the smallest error.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Jia, Bao-xin& Sun, Ao& Pan, Yi-shan& Chen, Hao& Liu, Feng-pu. 2019. Accurate Method for Picking Up the First Arrival Time of Microseismic Signals Based on Entropy Theory. Advances in Civil Engineering،Vol. 2019, no. 2019, pp.1-17.
https://search.emarefa.net/detail/BIM-1116656

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Jia, Bao-xin…[et al.]. Accurate Method for Picking Up the First Arrival Time of Microseismic Signals Based on Entropy Theory. Advances in Civil Engineering No. 2019 (2019), pp.1-17.
https://search.emarefa.net/detail/BIM-1116656

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Jia, Bao-xin& Sun, Ao& Pan, Yi-shan& Chen, Hao& Liu, Feng-pu. Accurate Method for Picking Up the First Arrival Time of Microseismic Signals Based on Entropy Theory. Advances in Civil Engineering. 2019. Vol. 2019, no. 2019, pp.1-17.
https://search.emarefa.net/detail/BIM-1116656

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1116656