Cost Estimation Model Using Modified Parameters for Construction Projects

المؤلفون المشاركون

Ji, Sae-Hyun
Ahn, Joseph
Lee, Hyun-Soo
Han, Kyeongjin

المصدر

Advances in Civil Engineering

العدد

المجلد 2019، العدد 2019 (31 ديسمبر/كانون الأول 2019)، ص ص. 1-10، 10ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2019-07-30

دولة النشر

مصر

عدد الصفحات

10

التخصصات الرئيسية

هندسة مدنية

الملخص EN

Construction projects require huge amounts of capital and have many risk factors due to the unique industry characteristics.

For a project to be successful, accurate cost estimation during the design phase is very important.

Thus, this research aims to develop a cost estimation model where a modification method integrates influential factors with significant parameters.

This study identified a modified parameter-making process, which integrates many influential factors into a small number of significant parameters.

The proposed model estimates the cost using quantity-based modified parameters multiplied by their price.

A case study was conducted with 24-residence building project, and the estimation accuracy of the suggested method and a CBR model were compared.

The proposed model achieved higher overall cost-estimation accuracy and stability.

A large number of influence factors can be modified as simple representatives and overcome the limitations of a conventional cost estimation model.

The paper originality relates to providing a modified parameter-making process to enhance reliability of a cost estimation.

In addition, the suggested cost model can actively respond to the iterative requirements of recalculation of the cost.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Ji, Sae-Hyun& Ahn, Joseph& Lee, Hyun-Soo& Han, Kyeongjin. 2019. Cost Estimation Model Using Modified Parameters for Construction Projects. Advances in Civil Engineering،Vol. 2019, no. 2019, pp.1-10.
https://search.emarefa.net/detail/BIM-1117307

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Ji, Sae-Hyun…[et al.]. Cost Estimation Model Using Modified Parameters for Construction Projects. Advances in Civil Engineering No. 2019 (2019), pp.1-10.
https://search.emarefa.net/detail/BIM-1117307

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Ji, Sae-Hyun& Ahn, Joseph& Lee, Hyun-Soo& Han, Kyeongjin. Cost Estimation Model Using Modified Parameters for Construction Projects. Advances in Civil Engineering. 2019. Vol. 2019, no. 2019, pp.1-10.
https://search.emarefa.net/detail/BIM-1117307

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1117307