Construction Database-Supported and BIM-Based Interface Communication and Management: A Pilot Project

المؤلفون المشاركون

Lin, Yu-Cheng
Su, Yu-Chih
Jung, Shuh

المصدر

Advances in Civil Engineering

العدد

المجلد 2019، العدد 2019 (31 ديسمبر/كانون الأول 2019)، ص ص. 1-12، 12ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2019-03-11

دولة النشر

مصر

عدد الصفحات

12

التخصصات الرئيسية

هندسة مدنية

الملخص EN

Construction projects are subject to numerous interface problems, particularly during the construction phase.

The absence of suitable systems or platforms to tackle these issues could hinder the performance of construction management.

Thus, the communication and management of interfaces (CMI) are necessary to improve the quality of the management of construction projects.

E-mail and generic construction information systems are commonly used communication tools; however, they pose several limitations in recording and managing as well as in responding to interface problems.

Building information modeling (BIM), by contrast, saves and delivers information in a digital format in a 3D computer-aided design (CAD) environment.

The adoption of BIM technology integrated with web technology for construction projects allows users to communicate interface issues and obtain responses for them effectively.

Thus, this study develops a database-supported and BIM-based CMI (DBCMI) system for general contractors to enhance their CMI work efficiency during the construction phase.

To confirm the efficacy of the CMI, the DBCMI system was used in a building project in Taiwan.

The case study results reveal that the proposed DBCMI system is an effective communication and management platform, particularly for practical CMI work integrated with BIM technology.

This study concludes with the benefits of using the proposed system and possible limitations in its further application.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Lin, Yu-Cheng& Jung, Shuh& Su, Yu-Chih. 2019. Construction Database-Supported and BIM-Based Interface Communication and Management: A Pilot Project. Advances in Civil Engineering،Vol. 2019, no. 2019, pp.1-12.
https://search.emarefa.net/detail/BIM-1117338

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Lin, Yu-Cheng…[et al.]. Construction Database-Supported and BIM-Based Interface Communication and Management: A Pilot Project. Advances in Civil Engineering No. 2019 (2019), pp.1-12.
https://search.emarefa.net/detail/BIM-1117338

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Lin, Yu-Cheng& Jung, Shuh& Su, Yu-Chih. Construction Database-Supported and BIM-Based Interface Communication and Management: A Pilot Project. Advances in Civil Engineering. 2019. Vol. 2019, no. 2019, pp.1-12.
https://search.emarefa.net/detail/BIM-1117338

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1117338