An Analysis of Construction Failure Factors to Stakeholder Coordinating Performance in the Finishing Phase of High-Rise Building Projects

المؤلفون المشاركون

Nguyen, Viet T.
Do, Sy T.
Vo, Nhat M.
Nguyen, Thu A.
Pham, Son V. H.

المصدر

Advances in Civil Engineering

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-14، 14ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-12-29

دولة النشر

مصر

عدد الصفحات

14

التخصصات الرئيسية

هندسة مدنية

الملخص EN

A poorly coordinated performance among stakeholders in the finishing phase can impair the performance of a high-rise building project.

Therefore, it is necessary to analyze construction failure factors (CFFs) to stakeholder coordinating performance (SCP) in the finishing phase of high-rise building projects and to uncover their underlying relationships.

CFFs to SCP in construction projects, especially in the finishing phase of high-rise building projects, have not yet been discovered.

The study identified 30 CFFs to the SCP and ranked them according to the perspective of the stakeholders, including owners/consultants and contractors/subcontractors.

Additionally, four factors of the CFFs, namely, traditional adversarial relationship, poor project planning and organization, incompetent parties, and delays of parties toward construction works were extracted by the factor analysis method.

This study fills the gap in knowledge related to the coordination performance in construction projects.

The findings could help stakeholders to enhance their coordinating performance in high-rise building projects.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Nguyen, Viet T.& Do, Sy T.& Vo, Nhat M.& Nguyen, Thu A.& Pham, Son V. H.. 2020. An Analysis of Construction Failure Factors to Stakeholder Coordinating Performance in the Finishing Phase of High-Rise Building Projects. Advances in Civil Engineering،Vol. 2020, no. 2020, pp.1-14.
https://search.emarefa.net/detail/BIM-1122361

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Nguyen, Viet T.…[et al.]. An Analysis of Construction Failure Factors to Stakeholder Coordinating Performance in the Finishing Phase of High-Rise Building Projects. Advances in Civil Engineering No. 2020 (2020), pp.1-14.
https://search.emarefa.net/detail/BIM-1122361

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Nguyen, Viet T.& Do, Sy T.& Vo, Nhat M.& Nguyen, Thu A.& Pham, Son V. H.. An Analysis of Construction Failure Factors to Stakeholder Coordinating Performance in the Finishing Phase of High-Rise Building Projects. Advances in Civil Engineering. 2020. Vol. 2020, no. 2020, pp.1-14.
https://search.emarefa.net/detail/BIM-1122361

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1122361