An Analysis of Construction Failure Factors to Stakeholder Coordinating Performance in the Finishing Phase of High-Rise Building Projects
المؤلفون المشاركون
Nguyen, Viet T.
Do, Sy T.
Vo, Nhat M.
Nguyen, Thu A.
Pham, Son V. H.
المصدر
العدد
المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-14، 14ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2020-12-29
دولة النشر
مصر
عدد الصفحات
14
التخصصات الرئيسية
الملخص EN
A poorly coordinated performance among stakeholders in the finishing phase can impair the performance of a high-rise building project.
Therefore, it is necessary to analyze construction failure factors (CFFs) to stakeholder coordinating performance (SCP) in the finishing phase of high-rise building projects and to uncover their underlying relationships.
CFFs to SCP in construction projects, especially in the finishing phase of high-rise building projects, have not yet been discovered.
The study identified 30 CFFs to the SCP and ranked them according to the perspective of the stakeholders, including owners/consultants and contractors/subcontractors.
Additionally, four factors of the CFFs, namely, traditional adversarial relationship, poor project planning and organization, incompetent parties, and delays of parties toward construction works were extracted by the factor analysis method.
This study fills the gap in knowledge related to the coordination performance in construction projects.
The findings could help stakeholders to enhance their coordinating performance in high-rise building projects.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Nguyen, Viet T.& Do, Sy T.& Vo, Nhat M.& Nguyen, Thu A.& Pham, Son V. H.. 2020. An Analysis of Construction Failure Factors to Stakeholder Coordinating Performance in the Finishing Phase of High-Rise Building Projects. Advances in Civil Engineering،Vol. 2020, no. 2020, pp.1-14.
https://search.emarefa.net/detail/BIM-1122361
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Nguyen, Viet T.…[et al.]. An Analysis of Construction Failure Factors to Stakeholder Coordinating Performance in the Finishing Phase of High-Rise Building Projects. Advances in Civil Engineering No. 2020 (2020), pp.1-14.
https://search.emarefa.net/detail/BIM-1122361
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Nguyen, Viet T.& Do, Sy T.& Vo, Nhat M.& Nguyen, Thu A.& Pham, Son V. H.. An Analysis of Construction Failure Factors to Stakeholder Coordinating Performance in the Finishing Phase of High-Rise Building Projects. Advances in Civil Engineering. 2020. Vol. 2020, no. 2020, pp.1-14.
https://search.emarefa.net/detail/BIM-1122361
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1122361
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر