The Prediction of Metro Shield Construction Cost Based on a Backpropagation Neural Network Improved by Quantum Particle Swarm Optimization

المؤلفون المشاركون

Wu, Han
Liu, Lanjun
Liu, Denghui
Wang, Xinyu

المصدر

Advances in Civil Engineering

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-15، 15ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-12-19

دولة النشر

مصر

عدد الصفحات

15

التخصصات الرئيسية

هندسة مدنية

الملخص EN

The prediction of construction cost of metro shield engineering is of great significance to project management.

In this study, we used the rough set theory, a backpropagation (BP) neural network, and quantum particle swarm optimization (QPSO) to establish a prediction model for predicting the metro shield construction costs.

The model accounts for the complexity of metro shield construction and the nonlinear relationship between the construction cost factors.

First, the factors affecting the construction cost were determined by referring to the Chinese National Standards and analysing the engineering practice of typical metro shield projects.

The rough set theory was used to simplify the system of influencing factors to extract the dominant influencing factors and reduce the number of input variables in the BP neural network.

Since the BP neural network easily falls into a local minimum and has a slow convergence speed, QPSO was used to optimize the weights and thresholds of the BP neural network.

This method combined the strong nonlinear analysis capabilities of the BP and the global search capabilities of the QPSO.

Finally, we selected 50 projects in China for a case analysis.

The results showed the dominant factors affecting the construction cost of these projects included ten indicators, such as the type of tunnelling machine and the geological characteristics.

The determination coefficient, mean absolute percentage error, root mean square error, and mean absolute error, which are frequently used error analysis tools, were used to analyse the calculation errors of different models (the proposed model, a multiple regression method, a traditional BP model, a BP model optimized by the genetic algorithm, and the BP model optimized by the particle swarm optimization).

The results showed that the proposed method had the highest prediction accuracy and stability, demonstrating the effectiveness and excellent performance of this proposed method.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Liu, Lanjun& Liu, Denghui& Wu, Han& Wang, Xinyu. 2020. The Prediction of Metro Shield Construction Cost Based on a Backpropagation Neural Network Improved by Quantum Particle Swarm Optimization. Advances in Civil Engineering،Vol. 2020, no. 2020, pp.1-15.
https://search.emarefa.net/detail/BIM-1122520

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Liu, Lanjun…[et al.]. The Prediction of Metro Shield Construction Cost Based on a Backpropagation Neural Network Improved by Quantum Particle Swarm Optimization. Advances in Civil Engineering No. 2020 (2020), pp.1-15.
https://search.emarefa.net/detail/BIM-1122520

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Liu, Lanjun& Liu, Denghui& Wu, Han& Wang, Xinyu. The Prediction of Metro Shield Construction Cost Based on a Backpropagation Neural Network Improved by Quantum Particle Swarm Optimization. Advances in Civil Engineering. 2020. Vol. 2020, no. 2020, pp.1-15.
https://search.emarefa.net/detail/BIM-1122520

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1122520