Study on the Allowable Exposure Time of Temporary Goaf in the Open Stope and Backfill Mining Method with Large Structure Parameters

المؤلفون المشاركون

Wang, Weijun
Liu, Xiaosheng
Luo, Yizhong
Zhan, Jin

المصدر

Advances in Civil Engineering

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-9، 9ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-09-07

دولة النشر

مصر

عدد الصفحات

9

التخصصات الرئيسية

هندسة مدنية

الملخص EN

Based on the uniaxial rheological experiment data of iron ore rock mass and filling body in large-scale stope obtained by using the rock servo controlling creep equipment, the characteristics of the creep curve were analyzed.

The creep models of iron ore and filling body which can show the attenuation creep of rock were constructed.

And a nonlinear creep model was obtained.

According to the rheological data of the iron ore and the filling body, the parameters of the new nonlinear creep model were identified to obtain the material parameters of the creep model.

Then, the creep model parameters were fitted and reduced to calculate the reasonable exposure time of temporary goaf in the large-scale stope.

The results show that the reasonable exposure time of stope is 520 ~ 650 days, and the reasonable exposure time of filling body is 410 ~ 520 days.

The model can well describe the initial attenuation creep stage and steady creep stage in the creep curve, which proves the correctness and rationality of the model.

The study provides a reference for mining design and safety production of similar mines with large-scale stope structure.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Liu, Xiaosheng& Wang, Weijun& Luo, Yizhong& Zhan, Jin. 2020. Study on the Allowable Exposure Time of Temporary Goaf in the Open Stope and Backfill Mining Method with Large Structure Parameters. Advances in Civil Engineering،Vol. 2020, no. 2020, pp.1-9.
https://search.emarefa.net/detail/BIM-1124122

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Liu, Xiaosheng…[et al.]. Study on the Allowable Exposure Time of Temporary Goaf in the Open Stope and Backfill Mining Method with Large Structure Parameters. Advances in Civil Engineering No. 2020 (2020), pp.1-9.
https://search.emarefa.net/detail/BIM-1124122

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Liu, Xiaosheng& Wang, Weijun& Luo, Yizhong& Zhan, Jin. Study on the Allowable Exposure Time of Temporary Goaf in the Open Stope and Backfill Mining Method with Large Structure Parameters. Advances in Civil Engineering. 2020. Vol. 2020, no. 2020, pp.1-9.
https://search.emarefa.net/detail/BIM-1124122

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1124122