Long-Term Settlement of High Concrete-Face Rockfill Dam by Field Monitoring and Numerical Simulation

المؤلفون المشاركون

Li, Yongye
Cao, Peng
Li, Zhigang
Zhou, Xinjie
Sun, Xinjian
Zheng, Junxing
Jiang, Haoyuan
Ma, Zhongxiang
Zhan, Qibing
Zhao, Yawei

المصدر

Advances in Civil Engineering

العدد

المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-17، 17ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2020-11-07

دولة النشر

مصر

عدد الصفحات

17

التخصصات الرئيسية

هندسة مدنية

الملخص EN

High concrete-face rockfill dams (CFRDs) with heights of over 100 m have been quickly developed in recent years.

The self-weight of rockfill materials causes creep deformation of the dam body.

However, the creep analysis method of high CFRDs in finite element software is few, and sometimes, it can also not reflect the long-term performance of high CFRDs well.

Therefore, it is necessary to carry out the secondary development in finite element software.

This study developed a subroutine that can run in Finite Element Method (FEM) platform ABAQUS to simulate long-term creep deformation behavior of the rockfill materials more accurately.

Then, a displacement back-analysis for parameters, based on the Xujixia high CFRD project, is performed by the neural network response surface method (BP-MPGA/MPGA).

Remarkable agreements are observed between simulation and field monitoring results.

The calibrated FEM model is used to predict stress and deformation behavior of the Xujixia high CFRD after three years of operation period.

The result indicates that rockfill creep deformation has a significant impact on stress and deformation of the high CFRD during the operation.

This research may predict long-term performance using FEM in the design stage for high CFRDs.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Zhou, Xinjie& Sun, Xinjian& Zheng, Junxing& Jiang, Haoyuan& Li, Yongye& Li, Zhigang…[et al.]. 2020. Long-Term Settlement of High Concrete-Face Rockfill Dam by Field Monitoring and Numerical Simulation. Advances in Civil Engineering،Vol. 2020, no. 2020, pp.1-17.
https://search.emarefa.net/detail/BIM-1125664

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Zhou, Xinjie…[et al.]. Long-Term Settlement of High Concrete-Face Rockfill Dam by Field Monitoring and Numerical Simulation. Advances in Civil Engineering No. 2020 (2020), pp.1-17.
https://search.emarefa.net/detail/BIM-1125664

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Zhou, Xinjie& Sun, Xinjian& Zheng, Junxing& Jiang, Haoyuan& Li, Yongye& Li, Zhigang…[et al.]. Long-Term Settlement of High Concrete-Face Rockfill Dam by Field Monitoring and Numerical Simulation. Advances in Civil Engineering. 2020. Vol. 2020, no. 2020, pp.1-17.
https://search.emarefa.net/detail/BIM-1125664

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1125664