An IDM-Based Approach for Information Requirement in Prefabricated Construction
المؤلفون المشاركون
Xu, Zhao
Abualdenien, Jimmy
Liu, Hao
Kang, Rui
المصدر
العدد
المجلد 2020، العدد 2020 (31 ديسمبر/كانون الأول 2020)، ص ص. 1-21، 21ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2020-01-27
دولة النشر
مصر
عدد الصفحات
21
التخصصات الرئيسية
الملخص EN
Prefabricated construction promotes providing better productivity and project results.
Building models, including their elements’ fabrication details, are complex structures that need accurate information delivery among the project participants and their partial designs.
This paper extends the IFC data model to support prefabricated construction.
Also, it discusses the advantages of systematically managing exchange requirements in a database to facilitate generating IDM (Information Delivery Manual).
The paper first introduces a BIM-based collaborative work mode by sharing and extracting the model views.
The core of the sharing is the establishment of view exchange standard about the linked model and the definition of exchange requirements based on the design process, leading to the formulation of the IDM standard again from the perspective of the actual design.
Process maps covering architecture, structure, plumbing, mechanical engineering, and electrical engineering are made to show how to realize BIM-based collaborative work.
Then the exchange requirements referred to the object and attribute of the BIM model which should be delivered in a special phase are defined in particular tables.
To facilitate the automation of managing and exchanging requirements, a database management system is designed with its corresponding user-interface, which enhances the collaboration and delivery throughout the project life cycle.
The proposed approach supports better information reuse and delivery among the project participants.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Xu, Zhao& Abualdenien, Jimmy& Liu, Hao& Kang, Rui. 2020. An IDM-Based Approach for Information Requirement in Prefabricated Construction. Advances in Civil Engineering،Vol. 2020, no. 2020, pp.1-21.
https://search.emarefa.net/detail/BIM-1125708
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Xu, Zhao…[et al.]. An IDM-Based Approach for Information Requirement in Prefabricated Construction. Advances in Civil Engineering No. 2020 (2020), pp.1-21.
https://search.emarefa.net/detail/BIM-1125708
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Xu, Zhao& Abualdenien, Jimmy& Liu, Hao& Kang, Rui. An IDM-Based Approach for Information Requirement in Prefabricated Construction. Advances in Civil Engineering. 2020. Vol. 2020, no. 2020, pp.1-21.
https://search.emarefa.net/detail/BIM-1125708
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1125708
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر