الملخص EN
The project duration can be shortened by overlapping construction activities.
However, the continuous changing of the environment tends to cause problems such as rework and the failure of the overlapping plan.
In order to solve these problems, communication strategies for the overlapping of dependent activities are first introduced and optimized from a revenue perspective.
We first consider the different maturities of upstream activity before and after the overlapping, the downstream sensitivity which is decided by involving communication strategies, and the learning and error-correcting ability of workers.
Then, the overlap and communication strategies are decided by calculating the maximum revenue using Monte Carlo simulation and MATLAB based on overlap cost, communication cost, rework cost, and reward amount.
Finally, the algorithm and BIM are combined to provide a visual overlap plan and dynamic control platform framework.
This research is valuable for practitioners as it provides a dynamic overlap plan which can maximize the revenue in changing the environment and ensure the duration of the project.
This research also provides researchers a new insight into combining overlap problems and BIM technology.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Ma, Guofeng& Liu, Xiaoye. 2020. Model and Algorithm for Dependent Activity Schedule Optimization Combining with BIM. Advances in Civil Engineering،Vol. 2020, no. 2020, pp.1-14.
https://search.emarefa.net/detail/BIM-1125979
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Ma, Guofeng& Liu, Xiaoye. Model and Algorithm for Dependent Activity Schedule Optimization Combining with BIM. Advances in Civil Engineering No. 2020 (2020), pp.1-14.
https://search.emarefa.net/detail/BIM-1125979
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Ma, Guofeng& Liu, Xiaoye. Model and Algorithm for Dependent Activity Schedule Optimization Combining with BIM. Advances in Civil Engineering. 2020. Vol. 2020, no. 2020, pp.1-14.
https://search.emarefa.net/detail/BIM-1125979
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1125979
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر