Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
المؤلفون المشاركون
المصدر
العدد
المجلد 2019، العدد 2019 (31 ديسمبر/كانون الأول 2019)، ص ص. 1-23، 23ص.
الناشر
Hindawi Publishing Corporation
تاريخ النشر
2019-11-28
دولة النشر
مصر
عدد الصفحات
23
التخصصات الرئيسية
الملخص EN
In the location-related planning of a hydropower system, the consideration of future operations under uncertainties can make the decisions sustainable and robust.
Then, it is of great importance to develop an effective approach that deals with the long-term stochasticity due to the long-lasting effects of the location selections.
Thus, we propose a multistage stochastic programming model to optimize the planning decisions of cascade hydropower stations and the long-term stochastic operations in an integrated way.
The first stage (i.e., the planning stage) in the model deals with the location and capacity decisions of the hydropower stations, while the subsequent stages implement the scheduling decisions under each stagewise stochastic scenario.
To address the curse of dimensionality caused by the long-term stochastic operations, we further propose a novel dimensionality reduction approach based on dual equilibrium to transform the multistage model into a tractable two-stage stochastic program.
The applicability of our approach is validated by a case study based on a basin of Yangtze River, China, and corresponding sensitivity analysis.
نمط استشهاد جمعية علماء النفس الأمريكية (APA)
Wang, Changjun& Chen, Shutong. 2019. Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties. Complexity،Vol. 2019, no. 2019, pp.1-23.
https://search.emarefa.net/detail/BIM-1131049
نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)
Wang, Changjun& Chen, Shutong. Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties. Complexity No. 2019 (2019), pp.1-23.
https://search.emarefa.net/detail/BIM-1131049
نمط استشهاد الجمعية الطبية الأمريكية (AMA)
Wang, Changjun& Chen, Shutong. Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties. Complexity. 2019. Vol. 2019, no. 2019, pp.1-23.
https://search.emarefa.net/detail/BIM-1131049
نوع البيانات
مقالات
لغة النص
الإنجليزية
الملاحظات
Includes bibliographical references
رقم السجل
BIM-1131049
قاعدة معامل التأثير والاستشهادات المرجعية العربي "ارسيف Arcif"
أضخم قاعدة بيانات عربية للاستشهادات المرجعية للمجلات العلمية المحكمة الصادرة في العالم العربي
تقوم هذه الخدمة بالتحقق من التشابه أو الانتحال في الأبحاث والمقالات العلمية والأطروحات الجامعية والكتب والأبحاث باللغة العربية، وتحديد درجة التشابه أو أصالة الأعمال البحثية وحماية ملكيتها الفكرية. تعرف اكثر