Dynamic Early Warning Method for Major Hazard Installation Systems in Chemical Industrial Park

المؤلفون المشاركون

Kong, Yaguang
Xie, Chenfeng
Zheng, Song
Jiang, Peng
Guan, Meng
Wang, Fang

المصدر

Complexity

العدد

المجلد 2019، العدد 2019 (31 ديسمبر/كانون الأول 2019)، ص ص. 1-18، 18ص.

الناشر

Hindawi Publishing Corporation

تاريخ النشر

2019-05-20

دولة النشر

مصر

عدد الصفحات

18

التخصصات الرئيسية

الفلسفة

الملخص EN

The production and storage of major hazard installations (MHIs) bring potential risks to chemical industrial park (CIP).

In the production system of MHIs, its dangerous degree is mainly determined by key parameters, and abnormal key parameters often lead to accidents.

To predict the real-time risk values of MHIs and improve accident prevention ability of CIP, we need a method that can combine dynamic prediction and assessment.

Quantitative risk assessment (QRA) is not capable of modelling risk variations during the operation of a process.

Therefore, this paper adopts the data-driven approach.

Inspired by visual qualitative analysis and quantitative analysis, a dynamic early warning method is proposed for MHIs.

We can get the future trend of these key parameters by using strongly correlation variables to predict key parameters.

Fuzzy evaluation analysis is performed on the risk levels of key parameters, and the dynamic evaluation index of these MHIs is obtained.

This method can be applied to the dynamic evaluation of MHIs system in CIP.

It can contribute to the safety of CIP in some aspects.

نمط استشهاد جمعية علماء النفس الأمريكية (APA)

Kong, Yaguang& Xie, Chenfeng& Zheng, Song& Jiang, Peng& Guan, Meng& Wang, Fang. 2019. Dynamic Early Warning Method for Major Hazard Installation Systems in Chemical Industrial Park. Complexity،Vol. 2019, no. 2019, pp.1-18.
https://search.emarefa.net/detail/BIM-1132376

نمط استشهاد الجمعية الأمريكية للغات الحديثة (MLA)

Kong, Yaguang…[et al.]. Dynamic Early Warning Method for Major Hazard Installation Systems in Chemical Industrial Park. Complexity No. 2019 (2019), pp.1-18.
https://search.emarefa.net/detail/BIM-1132376

نمط استشهاد الجمعية الطبية الأمريكية (AMA)

Kong, Yaguang& Xie, Chenfeng& Zheng, Song& Jiang, Peng& Guan, Meng& Wang, Fang. Dynamic Early Warning Method for Major Hazard Installation Systems in Chemical Industrial Park. Complexity. 2019. Vol. 2019, no. 2019, pp.1-18.
https://search.emarefa.net/detail/BIM-1132376

نوع البيانات

مقالات

لغة النص

الإنجليزية

الملاحظات

Includes bibliographical references

رقم السجل

BIM-1132376